HomeMy WebLinkAboutMINUTES - 08191986 - X.11 • . X.11
THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA
Adopted this Order on August 19, 1986 by the following vote:
AYES: Supervisors Fanden., Schroder, McPeak, Torlakson & Powers
NOES: None
ABSENT: None
ABSTAIN: None
SUBJECT: In the Matter..of Award of Contract- for the San Pablo Creek Bank Repair
at Brookhaven Court Project No. 7505-6F8003-86, San Pablo Area.
Bidder Total Amount Bond Amounts
P & F. Construction $43,645 Payment Bond $21 ,822.50
101 39th Avenue Faith. Perf. $43,645.00
Oakland, CA 94601
Cimarron -Construction
Hess Construction
Fanfa Inc.
The above-captioned project and the specifications therefor being approved,
bids being duly invited and received by the Chief Engineer; and
The Chief Engineer recommending that the bid listed first above is the
lowest responsible bid and this Board , as the governing body of the Contra Costa
County Flood Control and Water Conservation District, concurring and so finding;
.. .IT IS BY THE BOARD ORDERED, that the contract for the furnishing of labor
and materials for said work is awarded to said first listed bidder at the listed
amount and at the unit prices submitted in said bid; and that said contractor
shall present two good and sufficient surety bonds as indicated above; and that
the Flood Control District shall prepare the contract therefor.
IT IS FURTHER ORDERED that, after the contractor has signed the contract
and returned it together with bonds as noted above and any required certificates
of insurance or other required documents , and the Chief Engineer has reviewed and _.
found them to be sufficient, the Chief Engineer is authorized to sign the contract
for this Board.
IT IS FURTHER ORDERED that, in accordance__with..the project specifications _
and/or upon signature ofthe contract by
_ the Chief Engineer, any hid bonds posted
by the bidders are to be exonerated and any checks or. cash submitted for bid
security shall be returned.
0B:s j 1 hereby certify tharihis Is a trueand correct copy of
bo:19.t 8 an action taken and entered on the Wnutes of.the
Board of Supervisors on the date shown.
Orig. Dept. Public Works Department (FCE) ATTESTED: AUG 1 9 1986
cc• County Administrator PHIL BATCHELOR, Clerk of the Board
Auditor/Controller of Supervisors and County Administrator
Chief Engineer
Design/Construction By Deputy
Accounting '
Contractor