Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
MINUTES - 12161975 - COB BOX 69
L ^a p -76 In the Board of Supervisors of Contra Costa County, State of California October '_31 , 19 78 In the Matter of Approving Agreement with the California Department of Fish and Game (La Gonda Way Retaining Wall Project) Danville Area . Project No . 4537-4463-665-78 IT IS BY THE BOARD ORDERED that the Public Works Director is AUTHORIZED to execute an agreement with the California Department of Fish and Game defining the conditions and manner in which the proposed project work is to be performed within the San Ramon Creek streambed in the Danville area . PASSED by the Board on October 31 ,- 1978 , ; I hereby certify that the foregoing is a true and correct copy of an order entered on the minutes of said Board of Supervisors on the date aforesaid. Witness my hand and the Seal of the Board of Originator: Public Works Department Supervisors Road Design Division affixed this2±L day of419 7 cc: Public Works Director California Dept. Fish S Game (Via p/W) J. R. OLSSON, Clerk County Auditor-Controller By //we44t� Deputy Clerk Helen H. Kent H -24 4/77 15m F n In the Board of Supervisors of Contra Costa County, State of California AS. EX OFFICIO THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT June 13 , 19 78 In the Matter of Approving Agreement with the California Department of Fish, and Game, Shepherd Bridge Repair, Project No. 7520-8547-77, Walnut Creek Area, Flood Control Zone 35. IT IS BY THE BOARD ORDERED, as ex officio the Board of Supervisors of Contra Costa County Flood Control and Water Conservation District, that the Agreement is APPROVED and the Public Works Director is AUTHORIZED to sign the Agreement with the California Department of Fish and Game. The Agreement defines the conditions and manner in which the proposed construction of the Shepherd Bridge Repair in a section of San Ramon Creek is to be performed. PASSED by the Board on June 13, 1978. I hereby certify that the foregoing is a true and correct copy of an order entered on the minutes of said Board of Supervisors on the date aforesaid. Originator: Public Works Dept. Witness my hand and the Seal of the Board of Flood Control Supervisors cc: Public Works Director affixed this 13th day of June 1978 Flood Control J. R...OLSSON, Clerk County Administrator County Counsel By Y4 A Deputy Clerk , ! Sandra L. Niel on H-24 4/77 15m } Notification No � f' THP No. 1p v AGREEMENT REGARDING PROPOSED STREAM OR LAKE ALTERATION THIS AGREEMENT, entered into between the State of California,.Department of Fish and Game hereinafter called the Departmer}t, and 0 (' -10 ��� - ��� Q ( �+�rJ t � .� iT1. I SZ Of ��;rte, State of ( J� U2��t f hereinafter called the operator, is as follows: WHEREAS, pursuant to Section I I rf`1 of California Fish and Came Code,' the operator; on the IS day of- Cl'-1CI �=4 19j_L, notified the Department that he intends to substantially divert or obstruct the natural flow of, or.substantially change the bed, channel, or bank of, or-use material from the •streambed of, the following water: '2'n{1 CSCrc`» ' r 7 in the County of Oh1-DE_ O S"C— -, State of California, S. 0 T._ -5 R Il _ ; WHEREAS, The Department.(represented by�.�irFi��nlYld? ti has made an inspection y of subject area on the 1 S1:5' day of 19-r&—1, and) has determined that .. ' such operations may substantia ll adversely, affect existing fish and wildlife resources includin c —n Cil THEREFORE, the Department hereby proposes measures to protect fish and wildlife during the operator's work. The operator hereby agrees to accept the following recommendations as part 'of his work:'Numbers from the:list of•recommendations on the back of this page and the following special recommendations: 1. All work in or near the stream or lake,shall be confined-to the period�l-1 _� nCXCj�IC to�� > > �;. • dt�1'�'arar�,�r,,r� t�. , C �r�( r, c=m ' ,. �- . , . ;s,. C.t�� � N •� ' OF SUPERVISORS CONTRA TA CO. .d'!JC , Uty . If the operator's work changes from that stated in the notification speci e,-trus agreement is moc longer Valid and a new'notification''shall be "submitted to the Department of.Fish and Game.'Failure to comply ' with the`pwi§ions of'this`agreement"andwith"other pertinent.Code Sections,:including .but. not,limitedito{i ;a i, Fish and-Came Code Sections 5650, 5652 and 5948, may result',in(prosecution,;,;[e;' l}sir r Jit ,;i:r�•L clJcc;:k ::e 1: 'i. ..J_ .. .. . i''7 :c t.:G::.�7 �. .r{ t.Ll. "-�,' tf7At;•r.[,Y. fi.0 IJf. i'!i. `.yEr! ia(:1 0[::U�•% :TLi,':L ff.:r.r Nothing in this agreement'authorizeslthe operator to tiespass' on'any 1ind•'or property, nor does it relieve"'`?' the operator of responsibility for compliance with applicable federal,;state,•ror.:local laws or ordinances. A con- ' summated agreemen does not necessarily constitute-Department of_Fish'and Came,endorsement of the proposed operation. ?ri" �.,.' ;; .J:r, ;,u,. :, ,. y s. :• .::�u This agreeme ecomes effective 1,and terminates i� �3•1 C(r,/v• Operator ,77 Deparbn epresentadw •,). ! {:., Title PUBLIC WORKS DIRECTOR Titl ^Dontri� Costa County Organization Public Works Departmeritr ;; ':'.! Department of Fish and Game, State of California Date June 13, 1978 y [ Date f 4 , °If inspection was not made, cross out words within parentheses. Wcrofiimed with board order . F0 1060 (1.77) RECOMMENDATIONS ' 1. Disturbance or removal of vegetation shall not exceed sary to construct barriers or fills. If work in the lake the minimum necessary to complete operations. The is unavoidable, a curtain enclosure to prevent siltation disturbed portions of any stream channel or lake mar- of the lake beyond the immediate working area shall gin within the high water mark of the stream or lake - be installed. The enclosure and any supportive material shall be restored to as near their original condition as shall be removed when the work is completed. possible. 14. Silt settling basins shall be located away from the stream 2. Restoration'shallinclude the revegetation of stripped: - • or.:lake-<to prevent discolored; silt=bearing water,from or exposed areas. reaching the stream or, lake. 3. Rock, riprap, or other erosion protection shall be placed 15. Preparation shall be made so-that'runoff from steep, in areas where vegetation cannot reasonably be expected erodible surfaces will be-diverted into stable areas with to-become reestablished. little erosion potential'.'Frequent water checks shall be es culverts or other structures"shall' placed on dirt,roads, cat tracks, or other work trails to 4. Installation of bridges, control erosion. be such that dater flow is not impaired and upstream or downstream passage of fish is assured at all times. 16. Wash water containing mud or silt from aggregate wash- Bottoms -of temporary culverts shall be placed at or ing or other operations shall not be allowed to enter a below stream channel grade. Bottoms of permanent " lake or flowing streams. — - culverts shall be placed below stream channel grade. -17. "a) A-silt catchment-basin shall be constructed across 5, Plans for design of concrete-sills-and other features the stream immediately below the project site. This that could potentially impede fish migrations must be - catchment basin shall be constructed of gravel which approved by Department engineers. -- -- — -- •- is free from-mud or silt. 6, When any dam (any artificial obstruction) 'is being b) Upon completionof the project and after all flowing constructed, maintained, or placed-in.operation, suffi- water m clear of is cleaof turbidity, the gravel along cient water shall at all times be allowed to pass down- with the trapped sediment shall he removed from the stream to maintain fishlife below the dam. stream. 18. If operations require moving.of equipment .across a T An adequate fish passage facility must be incorporated flowing- stream, such operations shall be conducted into any-barrier that obstructs fish passage. . - . - without substantially increasing stream turbidity. For 8. Any temporary dam (any artificial obstruction) con- repeated crossings;•the operator shall install-a bridge, structed shall only be built from material such as clean culvert,-or rock-fill crossing as specified in comments gravel which will cause little or no siltation. below. - - 9. No equipment will be operated in live stream channels. 19. If a stream channel has been altered during the opera- tions, its low flow channel shall be returned as nearly 10. Equipment shall not be operated in the stream channels as possible to its natural state without creating a possible of flowing live streams except as may be necessary to future bank erosion problem, or a flat wide channel or construct crossings or barriers and fills .at channel sluice-like area. If a lake margin has been altered, it changes. shall be returned as nearly as possible to its.natural 11. When work in a flowing stream is unavoidable, the state without creating a future bank erosion problem. entire 'streamflow shall!be diverted "around.the work The gradient'of the streambed or lake margin shall be area by a barrier; tempoiary''-culver4,' and/or a' new 'as nearly as possible the saine.gradient as•existed prior channel capable of permitting upstream and down- to disturbance. stream' fish movement. Construction of the barriei 20. Structures and associated materials.not designed to and/or the new channel shall"normally-begin in the'.: --- -withstand high seasonal flows shall be removed to areas downstream area and continue .in-an upstream direc-�,u., aal.above• the.;high,water ;mark_before-such flows occur. tion, 'and tb�'.flow.sallwb 0 en con struchon" f th'diversiionbis'comple ed. nCh nnel bank. _:�21.No debris, soil;:'silt,-sand,=bark; slash,-'sawdust,' rub- or barrier'construction ade' q' uate'shall be auate to preverit - ' '-bish; cemeni'or-concrete or�washings thereof,Foil or seepage into or from the work area. Channel banks or petroleum products or other organic or earthen material barriers shall not be made of earth`or other §ubstances -'•. -� from any logging, construction, or associated activity subject to erosion unless first enclosed by sheet piling, -- ..Of whatever-nature-shall be-allowed-to enter into or rock riprap,.or other protective material..The enclosure placed .where it,may.-be washed byrrairifall or.runoff and the supportivemto waters of the State. When operations- are .com- -d a and shall be removed when ' •n ,r pleted, any eziiesslinaterials'o'r"debris'shall be removed the work is completed and the removal shall normally___- �, from ;the ,work''area."i•N6 •rubbish',"h'all-^be''deposited proceed from downstream' in an'upstream direction. within 150 feet of the high water mark of any stream 12. Temporary fills shall- be -constructed of nonerodible-- -- } ."or.lake.c . r.rE .; cY., c':c_✓, a' ;z sz }ul;u materials and shall.be.removed,immediately upon work 22. he'o "eiator will noti the De arfinent of Fish and completion. p fi p ;;,•,;Came of.the,dateof;.commencement-of:operations and 13. Equipment' shall"`not be operated in -the lake or its the"date'of completion of operations at least five days margin"except during excavation and as may be neces- prior to such completion. f. a, �" k. ,-S.i 'Iiia '! �k .� .Y• , t •� - P,4'3 •✓. 5 wi;'.. _ .l;.r Q .i. .:«- f QUAD yI O9• ^• In the Board of Supervisors of Contra Costa County, State of California AS EX OFFICIO THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT April 18 , 19 78 In the Matter of Approving Agreement with the California Department of Fish and Game, Grayson Creek Improvements, Phase I , Project No. 7520-8535-76-A, Pleasant Hill Area, . Flood Control Zone 3B. IT IS BY THE BOARD ORDERED, as ex officio the Board of Supervisors of Contra Costa County Flood Control and Water Conservation District, that the CtGrru� Agreement is APPROVED and the Public Works Director is AUTHORIZED to sign the Agreement with the California Department of Fish and Game. The Agreement defines the conditions and manner in which the proposed construction of the Grayson Creek Improvements, Phase I , in a section of Grayson Creek is to be performed. PASSED by the Board on April 18, 1978. I hereby certify that the foregoing is a true and correct copy of an order entered on the minutes of said Board of Supervisors on the date aforesaid. Originator: Public Works Dept. Witness my hand and the Seal of the Board of Flood Control Supervisors cc: Public Works Director affixed this 18t1day of April 1978 Flood Control County Administrator J. R. OLSSON, Clerk County Counsel By Deputy Clerk y Sandra L. Niel on H-24 3/76 15m In the Board Of SUPervisors of Contra Costa County, State of California March 14 t9 78 In the Matter of = Approving Agreement with the California Department of Fish and Game (North Richmond Bypass Project) North Richmond Area. Project No. 0572-4345-665-78 IT IS BY THE BOARD ORDERED that the. Public Works Director is AUTHORIZED to execute an agreement with the California Department of Fish and Game defining the conditions and manner in which the proposed project work is to be performed within and over. Wildcat. Creek in the North Richmond area . PASSED by the Board on _ March 14 , 1978 . 1 hereby certify that the foregoing is a true and correct copy of an order entered on the minutes of said Board of Supervisors on the date aforesaid. Originator: Public Works Department Witness my hand and the Seal of the Board of Road Design Division Supervisors cc: Public Works Director affixed thisl4th day of liarch 19 '78 Calif. Dept. Fish & Game County Auditor-Controller J. R. O LSSON, Clerk By y�C✓ /' . ..� Deputy Cleric G f Sandra L. lie7(son H -24 3/76 15m C.. i J.' In the Board of Supervisors of Contra Costa County, State of California November 150' 19 77 In the Matter of Amendment No. 2 to Department of Fish and Game Agreement (Park Avenue Bridge Improvement Project) East Richmond Area. Project No. 1065-4413-665-77 IT IS BY THE BOARD ORDERED that the Public Works Director is AUTHORIZED to execute Amendment No. 2 to an Agreement with the California Department of Fish and Game dated March 2, 1976. Said Amendment concerns construction time and also reduces conservation measures in conjunction with the proposed Park Avenue Bridge Improvement Project on Wildcat Creek, in the East Richmond area. PASSED by the Board on November 15, 1977• hereby certify that the foregoing is a true and correct copy of an order entered on the minutes of said Board of Supervisors on the date aforesaid. Witness my hand and the Seal of the Board of Originator: Public Works Department Supervisors Road Design Division affixed this 15t4lay of_ November fq 77 cc: Public Works Director Dept. of Fish s Game J. R. OLSSON, Clerk County Auditor-Controller By Deputy Clerk im. rous H -24 3/76 15m Admendment No (2) hfication No. III-018-76_ - y AGREEMENT REGARDING PROPOSED STREAM OR LAKE ALTERATION THIS AGREEMENT, entered into between the State of California, Department of Fish and Game, hereinafter called the Department, and Contra Costa County Public Works Department of Qontra Costa State of California - , hereinafter called the operator, is as.follows: . WHEREAS, pursuant to Section 1601 of California Fish and.Game Code, the operator; on the 12 day of January —, 19-76 notified the Department that he intends to substantially divert - or obstruct the natural flow of, or substantial)y change the bed, channel, or bank of, or use material from the streambed of, the following water- Wildcat Creek lot 22 Rancho S Pablo_;n the County of Contra Costa_, State of California, S T R WHEREAS, the Department hereby certifies that an inspection of subject area was made on the nth. day of " -T3n'].g 19 6_, by the following Department personnel: Wdn—Y—�S.. Imsel 1 ---_—__. and it was determined that an.existing fish or game resource may be substantially adversely affected by such operatlons,q, THEREFORE, the Department hereby proposes measures to protect fish and wildlife during the operator's work. Theo erator herebg agrees to accept the following recommendations as part of his-work: Numbers i•# i• e 19 20• ---__ _— from the list of recommendations on,the back of this page and the following special recommendations: 1. All work in or near the stream or lake shall be confined to the period —A—ri l 4 F through_0C —1 1978 It l h 1a�i be I173ePd hQfnrP_axxy cpns ;rnic ion.-or distu basica of streamhp_d, It shall hp nnnetrniCied of wash-ed—rock min ilAUrs—a,1-0— and ghnll hp placed thrpe feet nnal--flo- If there will be no work in strtsa,Inb-eA—it-em #16 maybeom_ itted- If the operator's work changes from that stated in the notification specified above, this agreement. is no longer valid and a new"notification shall be submitted to the Department of Fish and Game. Failure to comply with the provisions of this agreement and with other pertinent. Code Sections, including but not limited. to Fish and Game.Codc Sections 5650, 5652 and 5948, may result.in prosecution. " Nothing in this agreement authorizes the operator to trespass on any land or property, nor does it relieve " the operator of r sponsibility for compliance with applicable federal,-state, or local laws or ordinances. This agree becomes effectiv c 1,19 73 and terminates Opt 1 Operato //�,O//+f//����� L oenahp2<ent,���d_�� .i11< Public Works Director Title Titie" Fish -and Ramg_W-al<dien Organization County of Contra Costa Department of Fish and Game, State of California Date November 15, 1977 Date Oct 1 1978 _ Microfilmed with board order. �� FG 1080 (12.73) RECOMMENDATIONS rt. Disturbance or removal.of.vegetation shall not exceed sary to construct barriers or fills. If work in the lake the minimum necessary to'complete operations. The is unavoidable, a curtain enclosure to prevent siltation disturbed portions of any stre;tm channel or lake mar- of the lake beyond the immediate working area shall gin within the high water mark of the stream or lake be installed.The enclosure and any supportive material shall be restored to as near their original condition as shall be removed when the work is completed. possible. 13. Silt settling basins shall be located away from the stream 2. Restoration shall include the revegetation of stripped or lake to prevent discolored, silt-bearing water from or exposed areas. reaching the stream or lake. 3. Rock, riprap, or other erosion protection shall be placed 14. Preparation ;shall be made so that nmoff from steep, in areas where vegetation cannot reasonably be.expected erodible surfaces will be diverted into stable areas with to become reestablished.. little erosion potential..Frequent water checks shall be placed on dirt roads, cat tracks, or other work trails to 4. Installation of bridges, culverts, or other structures shall control erosion. be such that water flow is not impaired and upstream or downstream passage of fish is assured at all times. . . 15. Wash water containing mud or silt from aggregate wash- Bottoms of tempporary culverts shall be placed at or ing or other operations shall not be allowed to enter a below 'stream channel grade. Bottoms .of permanent . lake or flowing streams. culverts shall be placed below stream channel grade. 16. A silt catchment basin shall be constructed across the 5. flans for design 'of concrete sills and 'other features stream immediately below the project.site. This catch- that could potentially impede fish migrations must .be ment basin shall be constructed of gravel which is free approved by Department engineers. from mud or silt. Upon completion of the project and after all flowing water in the area is clear of turbidity, 6. When any dam any artificial obstruction) is being the gravel alonbr with the trapped sediment.shall be constructed, maintained, or placed in operation, suffi- removed from the stream. cient water shall at all times be allowed to pass down- stream to maintain fishlife below the dam. 17. If•operations require moving' of equipment across a flowing stream, such operations shall be conducted 7. An adequate fish passage facility must be incorporated without substantially increasing stream turbidity. For into any barrier that obstructs fish passage. repeated crossings, the operator shall install a bridge, 8. Any dam (an artificial obstruction) constructed shall , '1 g• only be built from culvert or rock-fill om crossing. material such as clean washed gravel 18. If a stream channel has been altered during the opera- which will cause little or no siltation. tions, its low flow' channel shall be.returned as nearly 9. Equipment shall not be operated in the stream channels as possible to its nafu iiil state without creating a possible of flowing live streams except as maybe necessary .to future bank_crosion problem, or a flat wide channel or construct;crossings,or barriers and. fills at channel sluice-like area. If a lake margin has been altered, if changes. shall be returned as nearly as. possible to its natural :i 10. When work 'in a Rowing `stream is unavoidable, the state without creating a*future ank erosion problem. entire streamRaw shall be diverted around the work The gradient of the streambed or lake margin shall be area by a barrier, temporary culvert, and/or a new as nearly as possible the same gradient as existed prior channel capable of permitting upstream and clown- to disturbance. stream fish movement. Construction of the barrier 19. Structures find associated materials not designed to and/or 'tlie, hew channel shall normally begin in the withstand high seasonal flows shall be removed to areas downstream area'and continue in an upstream direc- above the high water mark before such 'flows occur. tion, and the flow shall be diverted only when con- struction of the diversion is completed. Channel bank . 20. No debris, soil, silt, sand, hark, slash, sawdust, rub- or harrier construction shalt be adequate to prevent bish, cement or concrete or washings thereof, oil or seepage into or from the work area. Channel banks or )ctroleum 3roducts or other organic or earthen material barriers shall not be made of earth or other substances from any logging, construction, or associated activity subject.to erosion unless first enclosed by sheet piling, of whatever nature shall tie allowed to enter into or rockriprap, or other,protective material. The enclosure placed where it may be washed by rainfall or runoff and the supportive material shall be removed when into,_waters of .the State. When operations are com- the work.is completed and the removal shall normally iiMeted, any excess materials or debris shall be removed proceed -from downstream in an upstream direction. Erom.. the work area. No rubbish shall be deposited 11. Temporary fills shall be constructed of nonerodible within 1.50 feet of the high water mark of any stream. materials and shall be removed immediately upon work or lake. completion: 21. The operator will notify the Department of Fish and 12. Equipment shall not be operated in the lake or its Came of the date of completion of operations at least margin.except_during.excavation and as may be.neves- five. days prior to such completion. In the Board of Supervisors of Contra Costa County, State of California November 15 , 19 77 In the Matter of Approving Agreement with the California Department of Fish and Game (Marsh Creek Road Bridge Reconstruction Project) , Brentwood Area. Project No. 3971-4301-661-76 IT IS BY THE BOARD ORDERED that the Public Works Director is AUTHORIZED to execute an agreement with the California Department of Fish and Game defining the conditions and manner in which the proposed construction work is to be performed within the Marsh Creek stream bed, Brentwood area. PASSED by the Board on November 15, 1977• I hereby certify that the foregoing is a true and correct copy of an order entered on the minutes of said Board of Supervisors on the date aforesaid. Witness my hand and the Seal of the Board of Originator: Public Works Department Supervisors Road Design Division affixed this 15thday of November 1977 cc: Public Works Director Dept. of Fish 6 Game J. R. OLSSON, Clerk County Auditor-Controller By ,7, /- i , Deputy Clerk [� N. Pous H - 24 3/70 15m • NotificationNo THP No. AGREEMENT REGARDING PROPOSED STREAM OR LAKE ALTERATION THIS AGREEMENT, entered in o between tbV State California, Department of Fi and Game, hereinafter called the Dcpartmentt and 1 of IY1Cli`111'v ,� State of ( wM: Z�l hereinafter called the operator, is as foljows: WHEREAS, pursuant, to Section �_ of California Fish and Game Code, the operator, on the _1 � clay of LEVE A �'t_` 19JL, notified the Department that he intends to substantially divert or obstruct the natural flow of, or substantially change the bed, channel, or bank of, or use material from the stre mbcd.4f, the following water: h ,r.1 i� ; 1 !�. '.��' 'k<, , in the County of C >r L State of California, S T�ZR Ay WHEREAS, The De artment (represented b; ll.t-'l t�'Y'-1'i'�f 7`[�"l has made an in of subject area on the �' — day of �L�LiC=1(1` Y 5— 19• � ) , and) has e�termined that such operations may substantially adversely effect cxi,tint! fish and wildlif re ources me udin , �p -�� C 11 Y t fl -.�11�� (1(Clr' _L��r __� t ? + , � THEREFORE, the Department hereby proposes measures to protect fish and wildlife during the operator's work. The o cr titerherebX agrees to accept the ollowing recommendations as part of his work: Numbers \,���T._1 �� �� i'�I =A 1,;3�A from the list of recommendations on the back of this page and the following special recommendations: 1. All work in or near the stream or lake.shall be confined to the period _ ` >nv' '.i •'fit"1F� - , r•I -L i ::{� -. `-_ tl -.`^ j I F., Ac If the operator's work changes from that stated in the notification specified above, this agreement is no longer valid and a new notification shall be submitted to the Department of Fish and Game. Failure to comply with the provisions of this agreement and with other pertinent Code Sections, including blit not limited to Fish and Game Code Sections 5650; 5652 and 5948, may result in prosecution. Nothing in this agreement authorizes the operator to trespass on any land or property, nor does it relieve the operator of responsibility for compliance with applicable federal„ state, or local laws or ordinances. A con- summated agrccrt cnt does not necessarily constitute Department of Fish and Game endorsement of the proposed operation. p This agreem becomes effective n1-f �!'_,'� and terminates �11"1�-X� Operator �,� I?epartmRnt_B presentative (� ,,...1..,' Title Public Works Director Titl�i' %t�lC � -.0 c 0C% llD +k 5 ITAI�- Organization County of Contra Costa Department of Fish and Game, State of California Date November 15, 1977 �- Date °If inspection was not macer., cross out words within parentheses. Microfilmed with board order FG 1060 (1.71) RECOMMENDATIONS 1. Disturbance or removal of vegetation shall not exceed sary to construct barriers or fills. If work in the lake the minimum necessary to complete operations. The is unavoidable, a curtain enclosure to prevent siltation disturbed portions of any stream channel or lake mar- of the lake beyond the immediate working area shall gin within the high water mark of the stream or lake be installed. The enclosure and any supportive material shall be restored to as near their original condition as shall he removed when the work is completed. possible. 14. Silt settling basins shall be located away from the stream 2. Restoration shall include the revegetation of stripped or lake to prevent discolored, silt-bearing water from or exposed areas. reaching the stream or lake. 3. Rock, riprap, or other erosion protection shall be placed 15. Preparation shall be made so that runoff from steep, in areas where vegetation cannot reasonably be expected erodible surfaces will be diverted into stable areas with to become reestablished. little erosion potential. Frequent water checks shall be es culverts, or other structures shall placed on dirt roads, cat tracks, or other work trails to 4. Installation of bridges, control erosion. be such that water flow is not impaired and upstream or downstream passage of fish is assured at all times. 16. Wash water containing mud or silt from aggregate wash- Bottoms of temporary culverts shall be place(] at or ing or other operations shall not be allowed to enter a below stream channel grade. Bottoms of permanent lake or flowing streams. culverts shall be placed below stream channel grade. 17. a) A silt catchment basin shall be constructed across 5. Plans for design of concrete sills and other features the stream immediately below the project site. This that could potentially impede fish migrations must be catchment basin shall be constructed of gravel which approved by Department engineers. is free from mud or silt. b) Upon completion of the project and after all flowing 6. When any dam (any artificial obstruction) is being constructed, maintained, or place(] in operation, suffi- water in the area is clear of turbidity, the gravel along Nvith the trapped sediment shall he removed from the cient water shall at all times be allowed to pass down- stream. stream to maintain fishlife below the dam. 7. An adequate fish passage facility must be incorporated 18. If operations require moving of equipment across a flowing stream, such operations shall be conducted into any barrier that obstructs fish passage. without substantially increasing stream turbidity. For 8. Any temporary dam (any artificial obstruction) con- repeated crossings, the operator shall install a bridge, structed shall only be built from material such as clean culvert, or rock-fill crossing as specified in comments gravel which will cause little or no siltation. below. 9. No equipment will be operated in live stream channels. 19. If it stream channel has been altered during the opera- tions, its low flow channel shrill be returned as nearly 10. Equipment shall not be operated in the stream channels as possible to its natural state without creating a possible of flowing live streams except as may be necessary to future bank erosion problem, or a flat wide channel or construct 'crossings or harriers and fills at channel sluice-like area.. If a lake margin has been altered, it. changes. shall be returned as nearly as possible to its natural 11. When work in a flowing stream is unavoidable, the state without creating a future bank erosion problem. entire strcamflow shall be diverted around the work The gradient of the streambed or lake margin shall be area by a barrier, temporary culvert, and/or a new as nearly as possible the same gradient as existed prior channel capable of permitting upstream and clown- to disturbance. stream fish movement. Construction of the barrier 20. Strictures and associated materials not designed to and/or the new channel shall normally begin in the withstand high seasonal flows shall be removed to areas downstream area and continue in an upstream dire(- above the high water mark before such flows occur. tion, and the flow shall be diverted only when con- struction of the diversion is completed. Channel bank 21. No debris, soil, silt, sand, Bark, slash, sawdust, nib- Dish, cement or concrete or washings thereof, oil or se barrier construction shall be adcr prevent petroleum products or other organic or earthen material seepage into or from the work area. Channel banks from any logging, construction, or associated activity subject to erosion unless first enclosed by sheet piling barriers shat] not be made of earth other substanceess of whatever nahnre shall be allowed to enter into or , rock riprap, or other protective material. The enclosure placed where it may. be washed by .rainfall or runoff and the supportive materia} shall be removed when into, waters of the State. When operations are com- the work is completed and the removal shall normally pleted, any excess materials or debris shall be removed proceed from downstream in an upstream direction. from the work area. No rubbish shall be deposited within 150 feet of the high water mark of any stream 12. Temporary fills shall be constructed of nonerodible or lake. materials and shall be removed immediately upon work completion. I 22. The operator will notify e Department thDcrhnent of Fish and Camc of the date of commencement of operations and 13. Equipment shall not be operated in the lake or its the date of completion of operations atJcast five days margin except (luring excavation and as may be neces- prior to such completion. '` 46474-OW t-17 6,250 QUAD QT OSP k In the Board of Supervisors of Contra Costa County, State of California July 5' 19 77 In the Matter of Approving Agreement with the California Department of Fish and Game (1977 Bridge Painting Project) North Richmond and Orinda Area. Project No. 4924-671-77 IT IS BY THE BOARD ORDERED that the Public Works Director is AUTHORIZED to execute an agreement with the California Department of Fish and Game defining the conditions and manner in which the proposed project work is to be performed in the North Richmond and Orinda area. PASSED by the Board on July 5, 1977. I hereby certify that the foregoing is a true and correct copy of an order entered on the minutes of said Board of Supervisors on the date aforesaid. Originator: Public Works Department Witness my hand and the Seal of the Board of Road Design Division Supervisors affixed this 5th day of _ July 19 77 cc: Public Works Director Calif. Dept. Fish & Game County Auditor-Controller � J. R. O LSSON, Clerk By Deputy Clerk A. PIS ep H -24 3/76 15m • Notification N(x THP No. AGREEMENT REGARDING PROPOSED STREAM OR LAKE ALTERATION THIS AGREEMENT, entered into between the S ate of Call ffoornia, D artment of Fish and Game; iher ei after called he Department, and e"< of ! State of //-A<I& / hereinafter called the operator, is as follows: WHEREAS, pursuaa t to"tSection _> of California Fish and Game Code, the operator, on'!"'`1 the_ day of /4____.,__ , 19-,Z7, notified the Department that he intends to substantially divert or obstruct the natural flow of, or subst�lntially change the bed, channel, or bank of, or use material from the streambed of, t e following water: ���i/lam/ T—�'�"/�/�� in the -County of.o r, State of California, S_ —T-/N R_,fCJ. WHEREAS, The De went (represented by_.C£' J has made an inspection 1 of subject area on the — clay of Jzoe7fL` , 19 , and) has determined that ' ' such operations may substantially adversely affect existing fish and wildlife resources including; "-'• '1 THEREFORE, the Department hereby proposes measures to protect fish and wildlife during the operator's work. -The open or heeb agrees toaccept the followm recommendations as part of his work: Numbers `3E'e -;iM from the list of recommendations,on,the- back of this page and the following special recommendations: 1. All work in or near the stream or lake shall be confined to the period . 009 e�7�1 I .. i If the operator's work changes from that stated in the notification specified above, this agreement is no longer valid and a new notification shall be submitted to the Department of Fish and Game. Failure to comply with the provisions of this agreement and with other pertinent Code Sections, including but not limited.to o.: Its Fish and Game Code Sections 5650, 5652 and 5948, may result in prosecution. i" -t r Nothing in this agreement authorizes the operator to trespass on any land or property, nor does it relieve the operator of responsibility for compliance with applicable federal, state, or local laws or ordinances. A con- summated agreement does not necessarily constitute Department of Fish and Game endorsement of the proposed' operation. This agree t becomes effectiv ,�1' and terminates " Operato ��— Department epresentative Title Public Works Director Title /�-�`C/�� � �� Organization Contra Costa County Department of Fish and Game, State of California Date Ju l y 5 , 1 9 7 7 Date / { °If inspection was not made, cross out words within parentheses. FG 1060 (1.77) I , e • Notification N �THP No. AGREEMENT REGARDING PROPOSED STREAM OR LAKE ALTERATION THIS AGREEMENT, entered into between the State of Cali rnia, Department of Fish and Game, 1."11 hereigafter calleSohe Department, and of r,X ,1 �ST of CUctz� State of �,/t�=� L' %i hereinafter called the operator, is as follows: WHEREAS, pursuant to Section of California Fish and Game Code, the operator, on •�'`' the 1Y day of , 19,77 notified the Department that he intends to substantially divert or obstruct the natural flow of, or substaut��ialllll cehaf� he bed, channel, or bank of, or use material from the."Gif.. streambed of, 14e following water: __��, //� l�'�y�.El in the;.County of State of California, S T R " a WHEREAS, The De 1 went (represented byzl'y /` 5 ��� has made an inspection' of subject area on the clay of , 19 , and) has determined that 't such operations may substantially adversely affect existing fish and wildlife resources including: e THEREFORE, the Department hereby proposes measures to protect fish and wildlife during the operator's work., The operator ereby>agrees to ,AJcept the Rowing recommendations as part of his work: Numbers'! from the list of recommendations on,the,1.,;:,! back of this page and the following special recommendations: n :): ;•,:.;' it i ,:,. 1. All work in or near the stream or lake shall be confined to the period f •t •.1 111•. If the operator's work changes from that stated in the notification specified above, this agreement is no'!:,T' longer valid and a new notification shall be submitted to the Department of Fish and Game. Failure to comply with the provisions of this agreement and with other pertinent .Code Sections, including but not- limited ,to -, i Fish and Game Code Sections 5650, 5652 and 5948, may result in prosecution. Nothing in this agreement authorizes the operator to trespass on any land or property, nor does it relieve the operator of responsibility for compliance with applicable federal, state, or local laws or ordinances. A con- summated agreeL es not necessarily constitute Department of Fish and Game endorsement of the proposed t'')"' operation. This agree n effectiy ' and terminates Operator t epartme Represelffative Title P u b t i c Wo r k s D i rector Title,;z�� %�?,��� Organization C o n t r aCosta County Department of Fish and Game, State of California Date July 5 , 1 9 7 7 Date <_ *If inspection was not made, cross out wogs within parentheses. FG 1060 (1.77) • Notification No —�7THP No. AGREEMENT REGARDING PROPOSED STREAM OR LAKE ALTERATION THIS AGREEMENT, entered into between the State of Cali orula.Departmentpf Fish and Game, here' after calle the Department, and �C1St � of , State of Li4 hereinafter called the operator, is as follows: WHEREAS, pursuanL to Sectionof California Fish and Game Code, the operator,'on 'r"Jkj the ,b day of 19,Z7, notified the Department that he intends to substantially divert�: .�,t� or obstruct the natural flow of, or substa tiall,Y ch e t�hye; bed channel r bank. of or use material from the s yeambed of, t following water: ��21 X*);2 �i� ��� in the County ofj:i ::L State of California, S T R '+':! .?i • t WHEREAS, The DeyartJt ent (represented by/��i(� ��f-�. �1,/has made an inspection i '' of subject area on the 6"Z` day of Ty��� 1977—,'and) has determined that such operations may substantially adversely affect existing fish and wildlife resources including: c;�u u r (o t THEREFORE, the Department hereby proposes measures to protect fish and wildlife during the operator's"" work. The operator hereby agrees to accept the following recommendations as part of his work; Numbers N 1 from the list of recommendations on the :}. . back of this page and the following special recommendations: ;z,;,,:;.:, 1. All work in or near the stream or lake shall be confined to the period } ]' _A�A c7-T l int n If the operator's work changes from that stated in the notification specified above, this agreement is no"r longer valid and a new notification shall be submitted to the Department of Fish and Came. Failure to comply with the provisions of this agreement and with other pertinent Code Sections, including but not limited �togz Fish and Game Code Sections 5650, 5652 and 5948, may result in prosecution. ", 1'11 1't Nothing in this agreement authorizes the operator to trespass on any land or property, nor does it relieve ` .the operator of responsibility for compliance with applicable federal, state, or local laws or ordinances. A con- summated agreem t does not necessarily constitute Department of Fish and Game endorsement of the proposed" operation. r. This agreeme ecomes effective o and terminates / ;.. Operator Department Represent ve i`� Title Public Works Director 1 Organization Contra Costa County Department of Fish and Game, State of California Date July 5 , 1 9 7 7 Date �7 *If inspection was not made, cross out words within parentheses. FG 1060 V-77) F'` CONTRA COSTA COUNTY 1 T .cr-k o�-• DATE Z t@ �1��1�'f FROM-\A QA ���•s VW�e+IA�K�SUB� �,�JECT I.A.t.ae�... Dc'rwJr-C�ylr4tw<.,��k OL ..QO dui L'v�� � �°✓�v�yir,..�^' \�raA.a(�. /�✓�'..w.ti.��.y.►. `6�(,"v'"r a'a'�11 � o�.... �lw�:vy ��►.r� �{pA,:4. Ow �.0✓ t�' `„" S SIGNED �-*"Qo� PLEASE REPLY HERE TO DATE RECEIVED 11977 J. R. OLSSON �OARDF $JPERVIS RS `Cn<C •--- e SIGNED INSTRUCTIONS-FILL IN TOP PORTION,REMOVE DUPLICATE IYELLOWI AND FORWARD REMAINING PARTS WITH CARBONS. TO REPLY, FILL IN LOWER PORTION AND SNAP OUT CARBONS. RETAIN TRIPLICATE IPINKI AND RETURN ORIGINAL. FORMMI03 Qs In the Board of Supervisors ' of Contra Costa County, State of California February 22 , 19 77 In the Matter of Approving Agreement with California Department of Fish and Game (Miscellaneous Culverts Project-1976, Project No. 4334-925-76, Morgan Territory Road) IT IS BY THE BOARD ORDERED that an agreement with the California Department of Fish and Game defining the conditions and manner in which the proposed construction work is to be performed at the Morgan Territory Road crossing of Cayetano Creek is APPROVED and the Chairman of the Board is AUTHORIZED to execute said agreement (Notification No. III-087-77). PASSED by the Board on February 22, 1977. I hereby certify that the foregoing Is a true and correct copy of an order entered on the minutes of said Board of Supervisors on the date aforesaid. Originator: Public Works Department Witness my hand and the Seal of the Board of Supervisors Construction Division affixed this 22 day of February 197 cc: Public Works Director California Dept. of Fish and J. R. OLSSON, Clerk Game (Public Works will transmit) �'9� R. E. Jones Construction By 713 12M c At , Deputy Clerk 4029 Treat Blvd. , Concord 94518 —Mildred 0. Ballard County Auditor-Controller Road Design Division H - 24 3/76 15m r� isfication No,'2Y AGREEMENT REGARDING PROPOSED STREAM OR LAKE ALTERATION THIS AGREEMENT, entered into between the State of California, Department of Fish and Game, hereinafter called the Department, and 't✓✓ �`- •�%l a%�' " A1C ��� '//� �� /�of State State of hereinafter called the operator, is as follows: WHEREAS, pursuant to Section of California Fish and Game Code, the operator, on ' ��� the' day of 't'�/✓ -✓ 19 , notified the Department that he intends to substantially divert or obstruct the natural flow of, or substantially change the bed, channel, or bank of, or use material from the streambed of the following water: ---in the County of (2-V> ,z'4 ?6671i/ , State of California, ST X.j R WHEREAS, the Department hereby certifies that an inspection of subject area was made on the day of s .U� 19�, by the following Department personnel: �/'21ot / /!�zS- I :� . and it was determined that an existing fish or game resource may be substantially adversely affected by such operations. THEREFORE, the Department hereby proposes measures to protect fish and wildlife during the operator's work. The operator hereby agrees to accept the following recommendations as part of his work: Numbers A 7, i,, A `i 1.5_, 4S., 1�7_- ZC4 from the list of recommendations on the back of this page and the following special recommendations: 1. All work in or near the stream or lake shall be confined to the period /J�// /,C ?E C � r A ',TIL�F%/-tel �a..n.-� L=..d l��r� 4il)!C l ri°6 ^°�-Sr •}%t�K 7['-r ) C.r -:<J, Cr Lc_ C<Z K rr.31 I/ ✓l 7 k:i; QJ.`= v Ll=F"N?L1 -✓✓Ir iG-rc���L I�FY✓1i, ftJA-rri �C/ /> ��/J/,U7 i/�Jif`7/=;�:d/ate-/!/ ,!.�"=.-G!�X) Fr C°d.-!'rtJ �r✓tflif=�: .:"�/�:'-i - /t•/F/ /r-i-'�' ��6Y�L/ls' / /..e/�n//LJ �F.f4- f/iE�rl !•'F� �^ .r'1�^'ti� -/:!/✓-:; - F,3�%'i�/i,LE—.���'i � ,1/,r,���S��l / IS.L..�-wl��� fY•f/IrL/ ��C'/G�-7//C��/."f ��Yi/� .CJ Imo/r/iC_L�- ✓'-,� �^�.fJ6 i'/ r= :�::�fC�/•diG�� GG :%- t� - /�-''c' .�` , ,t ?,•°.• �'.��I a'."'.>/iU.!IG SCJ /iC%G/rG.:!�%� f%'=�.:3/�sY.l ,��i'"i'=r'- ✓f.% �% O/L.l�r. — _..:•.r L� If the operator's work changes from that stated in the notification specified above, this agreement is no longer valid and a new notification shall be submitted to the Department of Fish and Game. Failure to comply with the provisions of this agreement and with other pertinent Code Sections, including but not limited to Fish and Game Code Sections 5650, 5652 and 5948, may result in prosecution. Nothing in this agree authorizes the operator to trespass on any land or property, nor does it relieve the operator f res sib' ' y for compliance with applicable federal, state, or local laws or ordinances. r This agr eme nt c tive o �7and terminates -"f /I✓% OperatG�/GlGG 14annPri U jof,_'c,,P S Department epresentative Title C'ilairn :r�-VYn r-, Ti . tle Organization County of CC/ crii t'nsta Department of Fish and Game, State of California Date r`,-•Yn,avnr 2?, 1?77 Date :;-7—,,/l!- 7-7 Q:di ,LOPROVVID BY C0't ;o'1Y COUTNS�:i; FG 1060 (12.73) cation 1\To,//� �-'r �: 77 F AGREEMENT REGARDING PROPOSED STREAM OR LAKE ALTERATION THIS AGM ENIENT, entered into between the State of California, Department of Fish and Game, hereinafter called the Department, and ' r -,-rii o;�/fir°" �' State of hereinafter called the operator, is as follows--_ WHEREAS, pursuant to Section � �� of California Fish and Game Code,. the operator, on the ^/=i1� day of 19ZZ, notified the Department that he intends to substantially divert or obstruct the natural flo%v of, or substantially change the bed, channel, orbank of, or use maferial from the streamtred of, the following water: —in the County of I 72y State of California, SST R Z WFI REAS, the Department hereby certifies that an inspection of subjecf area was made on the-_/Z& day of .��f: _, 197_1/_, by the following Department pen t and it was determined that an existing fish or game resource may be substantially adversely affected by such operations. THEREFORE, the Department hereby proposes measures to protect.fish and wildlife during the operator's work. The operator^hereby agrees to accept the following recommendations as part.of his work: Numbers /J',. from the list of recommendations on the back of this page anxi the following special recommendations: 1. All work in or near the stream or lake shall be confined to theperiod f!!% %G /,S ��-_I-G' h�I 'i I Y.'i=}'r P'] F c c•.c c_` L--K I-T-'- i;LJ( 11 1 74-10= til K*i cin OF- 71 F- a i (' 1.t=✓Y.L} ...r.'r'i F1-i[ d. �i _. 11i3....r, l i`7-FT7�.`_�� id t_r '/__ f-I-�' ..___.tel_/) _i�C'�/,CJ'i /r�lirl�7:/,�?ice: ii !',✓=Z/.i: ) .7 c�'-tc-:i°�:c1 •G�i�/G `r_'. >;/c�i_ . .�C��?G-i!`rC /`,y�rC�;./E'/c' ('r- :.=+�Jl.�'��/CG::C IY" .G>!/i' -':i�O-!.J i/> r'•t`r/L.i�:Jc.. -__.�S.CLLI L%�"-•-_�. �f7ii'i:c.t/i'7"/.Ul._�.<J :"'i�z==^/=7rt-`'!-� :' lJ�" c:v i/� -/'11:,5 -- . C"s�?!-7[%f`L� i'%t_Ji_�i-" •iryAG�. �iL-` ri:r_Y�r//f<'/it l:G j-.C�z ts'J .C_Y j �c=- -- r i(%�::'/_ .c� /:r7J..V�J �i=' •i7l-mac-�/C:� i%lc=" Vii':i'�_/c�:{"%� c If the operator's work changes from that stated in the notification specified above, this agreement is no longer valid and a new notification shall be submitted to the Department of Fish and Game. Failure to comply with the provisions of this agreement and with other pertinent Code Sections, including but not limited to Fish and Game Code Sections 5650, 5652 and 5948, may result in prosecution. Nothing in this agreement authorizes the operator to trespass on any land or property, nor.does it relieve the operator of responsibility-#ortompliance with applicable federal, state, or local laws or ordinances. This agre'etuent becorn and terminates r/ Operator• r r __ _. � x. -.- , . ,_,-= '• 1 n N. Boggess Department Representative Tid �Chazrr7 n�_Bcz _Qf.Sue - Title Organization cou of Contra Costa _ Department of Fish and Game, State of California Da::e__—ebrucuy 22, 1977Date -27/0 � / F01,04 APPROVED BY COUNTY COUNSEL FG 1060 (12.731. RECOXIMENDATIONS - • ?. 17i�turbarice or removal'of vegetation shall not exceed sary to construct barriers or fills. If work in the lake thv minimum necessary to complete operations. The is unavoidable, a curtain enclosure to prevent siltation disturbed portions of any.stream channel or lake mar- of the lake beyond the immediate working area shall gin within the high.water mark of the stream or lake be installed. The enclosure and any supportive material shall be restored to as near their original condition as shall be removed when the work is completed. possible. 13. Silt settling basins shall be located away from the stream 2. Restoration shall include the revegetation of stripped or lake to prevent discolored, silt-bearing water from or exposed areas. reaching the stream or lake. 3. Rock, riprap, or other erosion protection shall be placed 14. Preparation shall be made so that runoff from steep, in areas where vegetation cannot reasonably be expected erodible surfaces will be diverted into stable areas with tobecome reestablished. little erosion potential. Frequent water checks shall be es culverts or other structures shall placed on dirt roads, cat tracks, or other work trails to 4. Installation of bridges, control erosion. be such that water flow is not impaired and upstream or downstream passage of fish is assured at all times. 15. Wash water containing mud or silt from aggregate wash- Bottoms of temporary culverts shall be placed at or ing or other operations shall not be allowed to enter a below stream channel grade. Bottoms of permanent lake or flowing streams. culverts shall be; placed below stream channel grade. 16. A silt catchment basin shall be constructed across the 5. Plans for design of concrete sills and other features stream immediately below the project site. This catch- that- could potentially impede fish migrations must be ment basin.shall be constructed of gravel which is free approved by Department engineers. from mud or silt. Upon completion of the project and. after all flowing water in the area is clear of turbidity, 6. When any clam (any artificial obstruction) is being the gravel alonr with the trapped sediment shall be constructed, maintained, or placed in operation, suf i- removed from tte stream: tient water shall at all tirrres be allowed to pass down- stream to maintain fishlife below the dam. 17. If operations require moving of equipment across a flowing stream, such operations shall be conducted 7. An adequate fish passage facility must be incorporated without substantially increasing stream turbidity. For into any barrier that obstructs fish passage. repeated crossings, the operator shall install a bridge, S. A.ay dam (any artificial obstruction) constructed shall culvert, or rock-fill crossing. only be built from material such as clean washed gravel 13. If a stream channel has been altered during the opera- vrhich will cause little or no siltation. tions, its low flow channel shall be returned as nearly 9. Equipment shall not be operated in the stream channels as possible to its natural state without creating a possible . of Howing live streams except as may be necessary to future bank erosion problem, or a flat wide channel or construct crossings or barriers and fills at channel sluice-like area. If a lake margin has been altered, it chrngcs. shall be returned as nearly as possible to its natural 10. When work in a flowing stream is unavoidable, the state without creating a future bank erosion problem. entire streamllow shall be diverted around the work The gradient of the streambed or lake margin shall be area by a barrier, temporary culvert, and/or a new as nearly as possible the same gradient as existed prior chaim:?f capable of permitting upstream and clown- to disturbance. strel-m fish movement. Construction of the barrier 19. Structures and associated materials not designed to and/o: the new channel shall normally begin in the withstand high seasonal flows shall be removed to areas downstream area and continue in an upstream direc- above the high water mark before such flows occur. tion, and the flow shall be diverted only when con- struction of the diversion is completed. Channel bank 20. No debris, soil, silt, sand, bark, slash, sawdust, rub- or barrier construction shall be adequate to prevent bish, cement or concrete or washings thereof; oil or seepa,c into or from the work area. Channel banks or from products or other organic or earthen material barriers shall not be made of earth or other substances from any logging, construction, or associated activity snbiect to erosion unless first enclosed by sheet piling, of whatever nature shall he allowed to enter into or rcrk riprap, or other protective material. The enclosure placed where it may be washed by rainfall or runoff and the supportive material shall be removed when into, waters of the State. When operations are com- tne work is completed and the removal shall normally pleted, any excess materials or debris shall be removed proceed from downstream in an upstream direction. from the work area. No rubbish shall be deposited 11. Temporary fills shall be constructed of nonerodible within 150 feet of the high water mark of any stream materials and shall be removed immediately upon work or lake. . completion. 21. The operator will notify the Department of Fish and 12. Equipment shall not be operated in the lake or its Came of the date of completion of operations at least margin except during excavation and as may be neces- five days prior to such completion. ` / ` ©i OSP l t In the Board of Supervisors of Contra Costa County, State of California January 25 , 19 77 In the Matter of Approving Agreement with California Department of Fish and Game for Boulevard Way Bridge Replacement , Saranap-Walnut Creek Area . (Project No . 3851 -4358-661 -76 IT IS BY THE BOARD ORDERED that the Public Works Director is AUTHORIZED to execute an agreement with the California Department of Fish and Game (Notification No . III - 1102-76) defining the conditions and manner in which the proposed construction work is to be performed on the proposed Boulevard Way Bridge Replacement project , Saranap-Walnut Creek area . PASSED by the Board on January 25 , 1977 • I hereby certify that the foregoing is a true and correct copy of an order entered on the minutes of said Board of Supervisors on the date aforesaid. Witness my hand and the Seal of the Board of ORIGINATOR: Public Works Department Supervisors Road Design Division affixed this 25th day of January 19 77 cc: Public Works Director Ca 1 i f,., Dept. of Fish & Game J. R. OLSSON, Clerk County Auditor—Controller By 2n Deputy Clerk N. ]?ous H-24 3/76 15m *cation No. a AGREEMENT .REGARDING PROPOSED STREAM OR LAKE. ALTERATION W� THIS AGREEMENT, entered into between the State_ of California, Department of Fish and Game, here, after called.the Department-and of ]� f� i l ti)G Z- State ofhereinafter called the operator, is as follows: WHEREAS, p rsuant to Section >f> of California Fish and Game Code, the operator, on the Jill day of Q&64�k I--bc*k ,, 19 d the Department that lie intends to substantially divert or obstruct the natural flow of, or subst ntially change the bed, channel, or bank of, or use material from the s eambed of, the following water: _in the County:,of t l �' Cfr,ori' State of California S T R -- K 1r <,Ff(: ._,j it j r l_aL[,.I a<J �Jr7ar� �rF'/ 1_1(-7ije i4a[1 to>e.TS'�( WHEREAS, the Department hereby certifies that an inspection of subject area was made on the day of I i.re-.kJ'),ler&,g by the following Department personnel: j4aj x.= f<, j��e.�L>"';'Jr' and it was determined that an existing fish or game resource may be substantially adversely affected .by such operations. tq THEREFORE, the Department hereby proposes measures to protect fish and wildlife during the operator's work. The operator hereby agrees to accept the following recommendations as part of his work: Numbers A -2 >, U , �� (y� ��; / � � � � <<� from the,list of recommendations on the back of this page and the following special recommendations: 1. All work in or near the stream or lake shall be confined to the period A�uhA77 Z. ("\(-./:L(141G::.;'T Pir'('C.1t•:.� --r`(� l-?c:u_� f'„C'1 �!_�' r'F',�.��-ik'_(1(:t'In ,�7 l�f� '� Qi-F9'i.I� YiC: I_� 1 V',�K'[ Fo F'1 I">>I� VYI 1_�l•'-�%��� /`J�- CL-F%�'�7. Y' E T1:r.0l I F / 1"-',L I_['iU"% i'2--� lL i E/1_'1 L',1< ; 51L I riL r [( IL'_ f;11 f (C,l �i t`FL,(.. 1 < f >/�9', le2(I�Te (> c.)C: �C�;: 4q .?E [... [_)E :!>Ur--[ 7 H TU FE�1c�T .. it"L L.. '_-U1�--1"_''>f/� CJ.�13-(t�.L-�� 'k'[ /3 !E�!? i(L� ..•�-•HES l.�fJii'i`.'.>'i�(.J(-�%[O�tl 'CA- ' 2nr�?cam c1/'nA9 rJ��;�»P z'71c�n� or•- i''�'-c)_l� �-;f :SIL� � F-IL'�r✓-rte �, • . .. SbCL[ rSC- 17f'Ch��`(-. • �-:;JCS (�"Ja. ,—F NG,—('),�<j �L(' .) ;[-rE.� t,%<Jhl 'f..( . •1 If the operator's work changes from that stated in the notification specified above, this agreement is no longer valid and a new notification shall be submitted to the Department of Fish and Game. Failure to comply •- ,� with'the -provisions of this agreement and with other pertinent Code Sections, including but not limited to Fish and Game.Code Sections 5650, 5652 and 5948, may result in prosecution. Nothing in this.agreement authorizes the operator to trespass on any land or property, nor does it relieve the operator of,res onsibility for compliance with applicable federal, state, or local laws or ordinances. This agreemen comes effective cy% 17 7-.-a d terminates 7 = --- Operator Department Repre tative Title Title/=/ sic i�', 2 - '' z lli��e ' �C " '.�'• '1I Organization_ Department of JFish and Game, State of California Date Date— /- /- 77 7 _:ofilmed with board order Po' 6: ,,( --3 — FG 1060(12-79) RECOMMENDATIONS 1. Disturbance or removal of vegetation shall not exceed sary to construct barriers or fills. If work in the lake the minimum necessary to complete operations. The is unavoidable, a curtain enclosure to prevent siltation disturbed portions of any stream channel or lake mar- of the lake beyond the immediate.working area shall gin within the high water mark of the stream or lake be installed. The enclosure and any supportive material shall be restored,to-as near their original`condition as. shall be removed when the work is completed. possible. 13. Silt settling basins shall be located away from the stream 2. Restoration shall include the revege'tation•of stripped or lake to prevent discolored, silt-bearing water from or exposed areas. reaching the stream or lake. 3. Rock, riprap, or other erosion protection shall be placed 14. Preparation shall be made so that runoff from steep, in areas where vegetation cannot reasonably be expected erodible surfaces will be diverted into stable areas with Jo become reestablished, little erosion potential. Frequent water checks shall.be culverts or other structures shall placed on dirt roads, cat tracks, or other work trails to Installation of bridges, ,i i- control erosion. %111:f .,1 be such that water flow is not impaired and upstream or downstream passage of fish is assured at all times. 1.5. Wash water containing mud or silt from aggregate wash- Bottoms of temporary culverts shall be placed at or ing or other operations shall not be allowed to enter a below stream channel grade. Bottoms of permanent lake or flowing streams. culverts shall be placed below stream channel grade. 16. A silt catchment basin shall be constructed across the 5. Plans for design of concrete•sills and other features stream immediately below the project site. This catch- '; 4 that Could potentially impede fish migrations must be ment basin shall be constructed of gravel which is free . . approved by Department engineers. from maid or silt. Upon completion of the project and 6. When any dam (any artificial obstruction) is being r all lanter in ee area s clear turbidity, l the gravel with thtrappededimentslall be +: :`'constructed, maintained, or placed in operation, sufli- removed from the stream. ,,�iscient water shall at all.times be allowed to pass down- :` stream to maintain fishlife below the dam. 17. If operations require moving of equipment across a flowing stream, such operations shall be conducted ! 7. An adequate fish passage facility must be incorporated without substantially increasing stream turbidity. For into any harrier that obstructs fish passage. repeated crossings, the operator shall install a bridge, 1 8.. Any dam (any artificial obstruction) constructed shall culvert, or rock-fill crossing. I only be built from material such as clean washed gravel 18. If a stream channel has been altered during the opera- which will cause little or no siltation. tions, its low flow channel shall be returned as nearly i 9. Equipment shall not be operated in the stream channels as possible to its natural state without creating a possible of flowing live streams except as may be necessary to future bank erosion problem, or a flat wide channel or construct crossings or barriers and fills at channel sluice-like area. If a lake margin has been altered, it changes. . shall be returned as nearly as possible to its natural 10. When work in a flowing stream is unavoidable, the state without creating a future bank erosion problem. entire streamflow shall be diverted around the work Thegradient of the streambed or lake margin shall be area by a barrier, temporary culvert, and/or a new as nearly as possible the same gradient as existed prior channel capable of permitting upstream and down- to disturbance. stream fish —movement. Construction of` the barrier and/or the' new 'channel shall 'normally Begin in the 19, Structures and associated materials• not .designed to downstream area and continue in an upstream direc- withstand high seasonal flows shall be removed to areas _tion, and,the How shall be diverted only when con- above the high water mark before such flows occur. struction, of the diversion is completed. Channel bank 20. No debris, soil, silt,. sand, bark, slash, sawdust, rub- or barrier construction shall be adequate to prevent bish, cement or concrete or washings thereof, oil or seepage into 'or from the work area. Channel banks or petroleum n•oducts or other organic or earthen material barriers shall not be made of earth or other substances Irom any logging, construction, or associated activity subject to erosion unless first enclosed by sheet piling, of whatever nature shall be allowed to enter into or rock riprap, or other protective material. The enclosure placed where it may be washed by rainfall or runoff and the supportive material shall be removed when into, waters of the State. When operations are com- the work is completed and the removal shall normally pleted, ,my excess materials or debris shall be removed proceed, from downstream in an upstream direction. from the work area. No rubbish shall be deposited 11. Temporary, fills shall be constructed of nonerodible within 150 feet of the high water mark of any stream materials and shall be removed immediately upon work or lake. completion. 21. The operator will notify the Department of Fish and 12. Equipment shall not be operated in the lake or its Caine of the date of completion of operations at least margin except during excavation and as may be neces- five clays prior to such completion. QT OSP i In the Board of Supervisors of Contra Costa County, State of California November 2 , , 19 76 In the Matter of Agreement and Amendment to Prior Agreement with the California Department of Fish and Game , East. Richmond and Clyde Areas . Project No . 4371 -4283-661 -76 and 1065-45267665-72 The Public Works Director having recommended that he be authorized to execute an Agreement and an Amendment to a prior Agreement with the California Department of Fish and ' Game , the Agreement being in conjunction with the proposed Port Chicago Highway Bridge Reconstruction Project , Clyde area , and the Amendment in conjunction with the proposed Park Avenue Bridge .Reconstruction Project , East Richmond area , both the Agreement and the Amendment to the prior Agreement , are required under Section 1601 of the California Fish and Game Code. IT IS BY THE BOARD ORDERED that the recommendation. of the Public Works Director is APPROVED . PASSED by the Board on November 2 , 1976 . 1 hereby certify that the foregoing is a true and correct copy of an order entered on the minutes of said Board of Supervisors on the date aforesaid. --- Originator: Public Works Department Witness my hand and the Seal of the Board of Road Design Division Supervisors cc: Pubt is Works Director affixed this 2nd day of November 19 76 Fish b Game Dept. J. R. O'LSSON, Clerk By a . Deputy Clerk. Pati�+,rti_, N. EOUS H - 24 3/76 15m 1 • + ^ ' Acation No: III-241-76 AGREEMENT REGARDING PROPOSED STREAM OR LAKE ALTERATION THIS AGREEMENT, entered into between the State of California, Department of Fish and Game, hereinafter called the Department, and Contra Costa County Public Works Department of Martinez State of California hereinafter called the operator, is as follows: WHEREAS, pursuant to Section 1601 of California Fish and Game Code, the operator, on :, the 29 day of March 19 76 , notified the Department that lie intends to substantially divert or obstruct the natural flow of, or substantially change the bed, channel, or bank of, or use material from the streambed of, the following water: Plt. Diablo Creek _ _in the County of Contra Costa_, State of California, 5-13 T-2—N —R2'Jf MD0 WHEREAS, the Department hereby certifies that an inspection of subject area was made on the —7 day of Arri 1 by the following Department personnel J_e_a2LK._J_ONEES Jr. Wildlife Protection Branch and it was determined that an existing fish or game resource may be substantially adversely affected by such operations. THEREFORE, the Department hereby proposes measures to protect fish and wildlife during the operator's work. The operator hereby agrees to accept the following recommendations as part of his work: Numbers 1-2-3- -8-9-11 15-16-18-19-20-21 from the list of recommendations on the back of this page and the following special recommendations: 1. All work in or near the stream or lake shall be confined to the periodMay_lgJ977 1977 2. Zone of disturbance to stream channel or banks shall be limited to 60 ' upstream and 140 ' downstream of bridge median. 3. Prior to commencement of work, zone of disturbance shall be dewatered by means of a dam constructed of nonero3ible material. StreamTlow shall be conveyed by a pipeline to a point immediately downstream rom a. silt catchment barrier at downstream end of zone of dirturEannce. Diversion waters shall be preven e3 from eroding stream channel or banks. Silt catchment barrier shall be constructed—of clean gravel—orfTcient height to filter waters remaining in the pro ecJ t area.Fol owing completion of work, the silt barriersnalr_Fe opened allow free passage of ream- flow, but need not be removed from streambed. 4. Design and construction of bridge shall not permanently alter present low I flow channe12 nor shall it prevent upstream or downstream fish passage. 5. Revegetation of exposed areas is to be completed as soon as possible upon j completion of work within streambanks. 6. Operator shall be iWOMMMUM responsible for work of subcontractors on job. 8. The Department of Fish and Game is to be notified 30 days prior to start of construction. If the operator's work changes from that stated in the notification specified above, this agreement is no longer valid and a new notification shall be submitted to the Department of Fish and Game. Failure to comply with the provisions of this agreement and with other pertinent Code Sections, including but. not limited to Fish and Game,Code Sections 5650, 5652 and 5948, may .result in prosecution. Nothing n this agreement authorizes the operator to trespass on any land or property, nor does it relieve the operator o responsibility for compliance with applicable federal, state, or local laws or ordinances. P4ay 1 1977 October 1 1977 This agree nt becomes effec or __�.._—.— and tenni t ss Opera t _ �leA De i va Department Representative Title Public Works Director Title Patrol Lieutenant__ Organization Contra Costa County _ Department of Fish and Game, State of California Date_ November 2 , 1976 _ Date September 13, 1976 Microfilmed with board order FG 1060 (12.73) RECOMMENDATIONS ... . 1. Disturbance or removal-of vegetation shall not exceed sary to construct barriers or fills. If work in the lake the minimum necessary to complete operations. The is unavoidable, a curtain enclosure to prevent siltation disturbed portions of any,stream channel or lake mar of the lake beyond the immediate working area shall gin within the high water mark of the stream or lake be installed. The enclosure and any supportive material shall be restored to as near their original condition as shall be removed when the work is completed. possible. 1.3. Silt settling basins'shall be located away from the stream . 2. Restoration shall include the revegetation of stripped or lake to prevent discolored, silt-bearing water from or exposed areas. reaching the stream or lake. 3. Rock, riprap, or other erosion protection shall be placed 14. Preparation shall be made so that runoff from steep, in areas where vegetation cannot reasonably be expected erodible surfaces will be diverted into stable areas with to become reestablished, little erosion potential. Frequent water checks shall be 4. Installation of bridges, culverts, or other structures shall placed on dirt roads, cat tracks, or other work trails to • control erosion. be such that water flow is not impaired and upstream or downstream passage of fish is assured at all times. 1.5. Wash water containing mud or silt from aggregate wash- . Bottoms of temporary culverts shall be placed at or ing or other operations shall not be allowed to enter a below stream channel grade. Bottoms of permanent lake or flowing streams. culverts shall be placed below stream channel, grade.-, '+ 16: A,silt catchment basin shall be constructed_across,the 5. Plans for•design of concrete sills' andkatlaeiw e�gvres• stream immediately below the project site. This catch- •, that could potentially impede fish'•migrations must be merit basin shall be constructed of gravel which is free- approved by Department,engineers. from mud or silt. Upon completion of the project and after all flowing water in the area is clear of turbidity, 6. When any dam (any artificial obstruction)- is being Ithe gravel along with the-trapped sediment shall be constructed, maintained, or placed',in operation, suffi- removed from the stream., cient water shall 'at all times be allowed to pass down- stream to maintain fishlife below the dam. 17. if-'operations `require moving ofequipment across a flowing stream, ..such operations shall be. conducted .- 7. An adequate fish passage facility must be.incorporated -without substantially .increasing stream turbidity. For !'. ` into any barrier that,obstructs fish passage. repeated. crossins, the operator shall install a bridge, 8: Any dam (any artificial.obstruction) constructed shall culvert, 'or rock-fill crossing. only be built from material such as clean washed gravel 18.,If a stream,channel has been altered during-theopera- which will cause little or no siltation. - ' tions, its low flow channel shall be returned as nearly '- Equipment shall not be;operated in the stream,channels as possible to its natural state without cieating"a possible " of flowing live, streams-.except as may be necessary to : - future bank erosion problem, or a flat wide channel or "construct -crossings .,or barriers and fills at cliannel sluice-like area. If a lake margin has been'altered, it changes., shall be.returned as nearly as possible to its natural 10: When work in'a flowing stream is unavoidable;.•the state without creating a future bank .erosion problem. v entire streamflow .shall be •diverted around the work, The gradient of the streambed or lake margin shall be . area by a barrier, temporary culvert, and/or a new ' ' ` '' as nearly as possible the same gradient'as existed'prior.', channel capable of permitting upstream and down- to disturbance. stream fish - movement. Construction 'of the barrier 1J I Strictures and associated materials not designed to and/or;the new-channel shall normally begin in the withstand high.seasonal flows shall be removed to areas': downstream area and continue in an upstream direc- above the high water mark before such flows occur. tion, and the flow shall be diverted only when con- struction of the diversion is completed. Channel bank 20. No debris, soil, silt,' sand, bark, slash, sawdust, rub-., or barrier construction shall be adequate to prevent bish, cement or concrete or washings thereof, oil or seepage into or from the work area. Channel banks or petroleumi)roducts or other organic or earthen material barriers shall.not be made'of-earth or other substances from any logging, construction, or associated activity ; subject to erosion unless first enclosed, by sheet piling, of whatever nature shall be allowed to enter into or rock riprap, or other protective material. The enclosure placed where it may be washed by rainfall or runoff and the supportive material shall be removed when into, waters of the State. When operations are com- the work is completed and the removal shall normally pleted, any excess materials or debris shall be removed proceed;from downstream in an upstream direction, from the work area. No rubbish shall be deposited 11. Temporary. fills shall be constructed of non erodible within 150 feet of the high water mark of any stream materials and shall be removed immediately upon work or lake. completion. 21. The operator-will notify the Department of Fish and 12. Equipment shall not be operated in the lake or its Game of the date of completion of operations at least margin except during excavation and as may be neces- five clays prior to such completion. ' OT OBP /a bs- 4/, a - (0 6 s - 7r III-018-76 AP-W ,NT — 10fication No. AGREEMENT REGARDING PROPOSED STREAM OR LAKE ALTERATION. THIS AGREEMENT, entered into between the State of California, Department of Fish and Game, hereinafter called the Department, andContr. a Costa County Public VJorlts Department of Martinez State of California hereinafter called the operator, is as follows: WHEREAS, pursuant to Section 1601 of California Fish and Game Code, the operator, on the 12_ day of January 1.9 6—, notified the Department that lie intends to substantially divert or obstruct the natural flow of, or substantially change the bed, channel, or bank of, or use material frofn the �f1�' dad � s a following water: VJil drat Camel 2t�_Rancl_iQSI Pablo —in the County of State of California, S T ,R j WHEREAS, the Departmen ereby certifies that an inspection of subject area was made on the 1 day of January 19k, by the following Department personnel: Warden Frank Russell_ i --------and it was determined that an existing fish or game resource may he substantially adversely affected by such operations. THEREFORE, the Department hereby proposes measures to protect fish and wildlife during the operator's work. The operator hereby agrees to accept the following recommendations as part .of his work: Numbers _ --from the list of recommendations on the back of this page and the following special recommendations: l 1. All work in or near the,stream or lake shall be confined to the period May . 11 1977 to October 1 ' 77 t Item No 16 shall be placed before any construction or disturbance of k streambed. Shall be constructed of washed rock minmun size 311 and shall ' be placed three fee above seasonal flow. Department of Fish and Game is to be notified 30 days prior to start of construction. , r f i If the operator's work changes'.from that stated in the notification specified above, this agreement is no '4 longer valid and a new notification shall be submitted to the Department of Fish and Game. Failure to comply j with the .provisions of this agreement and with other pertinent Code Sections, including but not limited to Fish and Game Code Sections 5650, 5652 and 5998, may result in prosecution. l Nothing i this agreement authorizes the operator to trespass on any ]and or property, nor does it relieve the operator of responsibility for compliance with applicable federal, state, or local laws or ordinances. This agree t becomes effecti I 0 1`'Iay_�. 19_7__ and termi tes 0 o b e 1 77 ►- � Operator Stanle ' Department Representative Tit]e Public Works Director _ Title Patrol Lieutenant._ _ a: Organization Contra Costa County _ Department of Fish and Game, State of California Date November 2 , 1976 Date September 13, 19`76 _ Microfilmed with board order FG 1060 (12.73) RECOMMENDATIONS • 1. Disturbance or removal of vegetation shall not exceed sary to construct barriers.or fills. If work in the lake the minimum necessary to complete operations. The is unavoidable, a curtain enclosure to prevent siltation disturbed portions.of any.stream channel or lake mar- of the lake beyond,the immediate working ;area shall gin within the high water mark of the stream or lake be installed. The enclosure and any supportive material i shall be restored to as near their original condition as shall be removed when the work is completed. possible. 1.3. Silt settling basins shall be located away from the stream 2. Restoration shall include the revegetation of stripped . or lake to prevent discolored, silt-bearing'water from or.exposed areas. reaching the stream or lake. 3. Rock, riprap, or other erosion protection shall be placed 14. Preparation shall be made so that runoff from steep, in areas where.vegetation cannot reasonably be expected erodible surfaces will be diverted into stable areas with j to become reestablished. little erosion potential. Frequent water checks shall be- j! 4. Installation of bridges, culverts, or other structures shall placed on dirt roads, cat tracks, or other work trails tocontrol erosion. i be such that water flow is not impaired and upstream or downstream passage of fish is assured at all times. 15. Wash water containing mud or silt from aggregate wash- Bottoms of temporary culverts shall be placed at or ing or other operations shall not be allowed to enter a below stream channel grade. Bottoms of permanent lake or flowing streams. culverts shall be placed below stream channel grade. 16. A silt catchment basin shall he constructed across the 5. Plans for design of concrete sills and other features stream immediately below the project site. This catch- •1 . that could potentially impede fish migrations must be ment basin shall be constructed of gravel which is free approved by Department engineers. from mud or silt. Upon completion of the project and 6. When an dam an artificial obstruction is beim after all flowing water in the area is clear of turbidity, i y (any ) g the gravel along with the trapped sediment shall be constructed, maintained, or placed in operation, suffa- removed from the stream. cient water shall at all times be allowed to pass down- stream to maintain fishlife below the dam. 17. If operations require moving of equipment across a ,+ flowing stream, such operations shall be conducted 7. An.adequate fish passage facility must be incorporated )vithout substantially increasing stream turbidity. For into any barrier that obstructs fish passage. repeated crossings, the operator shall install a bridge, 8. Any dam (any artificial obstruction) constructed shall culvert, or rock-fill crossing. Only be built from material such as clean washed gravel 18. If a stream channel has been altered during the opera- which will cause little or no siltation. tions;.its. low_ flow channel shall be returned as nearly 9. Equipment shall not be operated in the stream channels as possible to its natural state without creating a possible of flowing live streams except as may be necessary to future bank erosion_ problem, or a flat wide channel or construct crossings or. barriers and _fills at channel sluice-like area. If a lake margin has been altered, it changes. shall be, returned as nearly as possible to its natural 10. When work'in a 'flo�i,'ing• stream is unavoidable, the state without creating a future-bank erosion problem. entire streamflow shall be diverted around the work The gradient of the streambe'd or lake margin shall be area by a barrier, temporary culvert, and/or a new as nearly as possible the same.gradient as, existed prior, channel capable of.permitting upstream and down- to disturbance. stream fish movement. Construction of the barrier lg• Structures and associated materials not designed to downstream .ne�v: clrann ontnshall normally begin in the .withstand high seasonal flows shall be removed to areas downstream area and continue in an upstream three- above the high water mark before such flows occur. tion, and the flow shall be diverted only when con- struction of the diversion is completed. Channel bank 20. No debris, soil, silt, sand, bark, slash, sawdust, rub- or barrier. construction shall be adequate to prevent bish, cement or, concrete or washings thereof, oil or seepage into or from the work area. Charnel banks or petroleum1)roducts or other organic or earthen material a barriers shall not be made of earth or other substances from any logging, construction, or associated activity subject to .erosion unless first enclosed by sheet piling, of whatever nature shall be allowed to enter into or rock riprap, or other protective material. The enclosure placed where it may be washed by rainfall or runoff and the supportive material shall be removed when into, waters of the State. When operations are com- the work is completed and the removal shall normally pleted, any excess materials or debris shall be removed proceed. from downstream in an upstream direction. from the work area. No rubbish shall be deposited 11. Temporary fills shall be constructed of nonerodible within 150 feet of the high water mark of any stream materials and shall be removed immediately upon work or lake. completion. 21. The operator will notify the Department of Fish and 12. Equipment shall not be operated in the Iake or its Game of the date of completion of operations at least margin except during excavation and as may be neces- five days prior to such completion. .L -- - @T05P In the Board of Supervisors of Contra Costa County, State of California July 20 19 76 In the Matter of In the Matter of Approving Agreements with the California Department of Fish and Game (Miscellaneous Culverts Project - 1976 , Project No . 4334-925-76 , Various Location IT IS BY THE BOARD ORDERED that the Public Works Director is AUTHORIZED to execute three agreements with the California Department of Fish and Game defining the conditions and manner in which the proposed construction work is to be performed at three sites ; Bethel Island Road (Notification No . II -237-76) Sandmound Boulevard (Notification No . II -238-76) , and Morgan Territory Road (Notification No . III -512-76) . PASSED by the Board on July 20 , 1976 . I hereby certify that the foregoing is a true and correct copy of an order entered on the minutes of said Board of Supervisors on the date aforesaid. Originator: Public Works Department Witness my hand and the Seal of the Board of Road Design Division Supervisors affixed this 20th day of July 19 cc: Public Works Director Calif. Dept. of Fish & Game a� J. R. OLSSON, Clerk - p ��County Auditor-Controller By a^ Deputy Clerk Jean L. Miller 9 7 H 24 8/75 10M ecation No. 11-237-76 >' AGREEMENT REGARDING PROPOSED STREAM OR LAKE ALTERATION THIS AGREEMENT, entered into between the State of California, Department of Fish and Game, hereinafter called the Department, and Contra Costa. County Public Works Department ' of Martinez , State of California hereinafter called the operator, is as follows: WHEREAS, pursuant to Section 1601 of California Fish and Game Code, the operator, on the 27-th'day of Mav ' 1976 , notified the Department that he intends to substantially divert or obstruct the natural flow of, or substantially Changge the bed, channel, or bank of, or use material from the streambed of; the following water: lrrigatlon%raina.ge ditch - - - - - in the County of Contra. Costa State of California, S 28 T 2N R 3E WHEREAS, the Department hereby certifies that an inspection of subject area was made on the 51h day of June _ 197-k—, by the following Department personnel: Lieutenant Donald �. Iy!cCoskey - - - - - - - - - - - - - - - - - - - - - - - - - and it was determined that an existing fish or game resource may be substantially adversely affected by such operations. THEREFORE, the Department hereby proposes measures to protect fish and wildlife during the operator's work. The operator hereby agrees to accept the following recommendations as part of his work: Numbers l -4- 1- 0- - - - - - - - - - - - - - from the list of recommendations on the back of this page and the following special recommendations: 1. All work in or near the stream or lake shall be confined to the period S eptember 1. 1976. to, October 31, 1976. 2. Temporary coffer dams shall be placed above and blow nnnstrun- tion area. 3._ Construction area shall be dvatered by numbing water from work a.rea.. 4. rmqve old culvert away from water. 5. l;1_5t_l1 new culverts. 6. Fa_Y flt_i 1 1. _around trench. 7-. Remove temporary cof-fer dams . 8 A1P1Px .Psis mud .and soil steal 1 bP rPmctva(l from cars-t-ructir,�r arca and not r?nl ace d into c na1 If the operator's work changes from that stated in the notification specified above, this agreement is no longer valid and a new notification shall be submitted to the Department of Fish and Game. Failure to comply with the provisions of this agreement and with other pertinent Code Sections, including but. not limited to - Fish and Game Code Sections 5650, 5652 and 5948, may result in prosecution. Nothing in this agreement authorizes the operator to trespass on any land or property, nor does it relieve the operator of sponsibility for compliance with applicable federal, state; or local laws or ordinances. This agreem becomes effectiv e otember 1. 1976and terminates October 31, 1976 Operator llepadment Repr en ve Public Works Director Patrol .Lieutenant Title .—__ - _ Title Organization Contra Costa County Department of fish and Game, State of California _ ' Date July 20 , 1976 Date June 7, 1976 Paofilmed with board or P FG 1060 I1z.73) I RECOMMENDATIONS 1. Disturbance or removal of vegetation shall not excc�cl sary to construct barriers or fills. If work in the lake the minimum necessary to complete operations. The is unavoidable; a curtain enclosure to prevent sili:aion disturbed portions of any stream 'channel or lake mar of the lake beyond the immediate working area small gin within the high water mark of the stream or lake be installed. The enclosure and any supportive material shall be restored to as near.their original condition as shall be removed when the work is cornpleied. possible. 1.3. Silt settling basins shall be located away from the stream 2. Restoration shall include the revegetatioh of stripped or lake to prevent discolored, silt-bearing water from or exposed areas. reaching the stream or lake. 3. Rock, riprap, or other erosion protection shall be placed 14. Preparation shall be made so that nmoff from steel), in areas where vegetation cannot reasonably be expected erodible surfaces will be diverted into stable areas with to become reestablished. little erosion potential. Frequent water checks shall be placed on dirt roads, cat tracks, or other work trails to 4- Installation of bridges, culverts, or other structures shall control erosion. be such that water flow is not impaired and upstream or doNvnstream passage of fish is assured at all times. 15. Wash water containing mud or silt from aggregate wash- Bottoms of temporary culverts shall be placed at or ing or other operations shall not be allowed to. enter a below stream channel grade. Bottoms of permanent lake or flowing streams. culverts shall be placed below stream charnel grade. 16. A silt catchment basin shall be constructed across the 5. Plans for design of concrete sills and other features stream immediately below the proiect site. This catch- that could potentially impede fish migrations must be ment basin shall be constructed of'gravel which is free approved by Department engineers. from mud or silt. Upon completion of the project and 6. When an dam an artificial obstruction is beim after all flowing water in the area is clear of turbidity, y (any ) O the gravel along with the trapped sediment shall be constructed, maintained, or placed in operation, suf- removed from the stream. cient ,vater shall-at all times be allowed to pass down- stream to maintain fishlife below the dam. 17. If operations require moving of equipment across a flowing stream, such operations shall be conducted 7. An adequate fist: passage facility must be incorporated without substantially increasing stream turbidity. For into any barrier that obstructs fish passage. repeated crossings, the operator shall install a bridge, 8. Any dam (an)., artificial obstruction) constructed shall culvert, or rock-fill crossing. only be built from material such as clean washed gravel 18. If a stream channel has been altered during the opera- which will cause little or no siltation. tions, its low flow channel shall be returned as nearly 9. Equipment shall not be operated in the stream channels as possible to its natural state without creating a possible of flowing live streams except as may be necessary to future bank erosion problem, or a Vat wide channel or construct crossings or barriers and fills at channel sluice-like area. If a lake margin has been altered it changes. shall be returned as nearly as possible to its natural 10. When work in a flowing stream is unavoidable, the state without creating a future bank erosion problem. entire streamflow shall be diverted around the work The gradient of the streambed or lake margin shall be area by a barrier, temporary culvert, and/or a new as nearly as possible the same gradient as existed prior channel capable of permitting upstream and down- to disturbance. stream fish movement. Construction of the barrier 19. Structures and associated materials not designed to and/or the new channel shall normally, begin in the downstream area and continue in an upstream direc- withstand high seasonal flows shall be removed to areas above 'the high water mark before such fled s occur. tion; and the flow shall.be diverted only when con- struction of the diversion is completed. Channel bank 20. No debris, soil, silt, sand, bark, slash, sawdust, rub- or barrier construction shall be adequate to prevent bish, cement or concrete or. washings thereof, oil or seepage into or from the work area. Channel banks or petroleum products or other organic or earthen material barriers shall not be made of earth or other substances from any logging, construction, or associated activity subject to erosion unless first enclosed by sheet piling, of whatever nature shall be allowed to enter into or rock riprap, or other protective material. The enclosure placed where it may be Nvashed by rainfall or runoff and the supportive material shall be removed when into, waters of the State. When operations are com- the work is completed and the removal shall normally pleted, any excess materials or debris shall be removed proceed from do%vnstream in an upstream direction. from the work area. No rubbish shall be deposited 11. Temporary fits shall be constructed of nonerodible within 150 feet of the high water mark of any stream materials and shall be removed immediately upon work or lake. completion. . . , 21. The operator will notify the Department of Fish and 12. Equipment shall not be operated in the lake or its Game of the date of completion of operations at least margin except during excavation and as may be neces- five days prior to such completion. (DT osr II-238-76 . . AGREEMENT REGARDING PROPOSED STREAM OR LAKE ALTERATION THIS AGREEMENT, entered into between the State of California, Department of Fish and Game, hereinafter.called the Department, and Contra. Costa County Public Works Department of A,Iartinez State of California hereinafter called the operator, is as follows: WHEREAS, pursuant to Section 1601 of California Fish and Game Code, the operator, on the ?nth day of May 1976, notified the Department that he intends to substantially divert or obstruct the natural flow of, or substantially chanthe bed, channel, or bank of, or use material from the streambed of, the following water: Irrigationgg drainage ditch - - - - in the County of Contra Costa , State of California, SST 2N Rte_. WHEREAS, the Department hereby certifies that an inspection of subject area was made on the 5th da of June , 192-6--, by the following Department personnel: Lieutenant Donald J. McCo5key - - - - -- - - - - - - - - - - - - - - - - - - - - and it was determined that an existing fish or game resource may be substantially adversely affected.by such operations. THEREFORE, the Department hereby proposes measures to protect fish and wildlife during the operator's work. The operator hereby agrees to accept the following recommendations as part of his work: Numbers' 1-4- 11 -20-21 — — _ — — — — — — — — — — — — — —from the list of recommendations on the back of this page and the following special recommendations: 1. All work in or near the stream or lake shall be confined to the period S eptember 1 , 1976 o to October 31, 1976. 2. Temporary coffer dams shall be placed above and below cons rbc- tion area. 3. Construction area shall be dewatered by pumpingg water from work. area. 40 Remove old culvert away from water. 5._Install new culverts 6. Bawlzfill around trench 7 .__ Remove temporary coffer dams. 8.� All excess mud and soil shall on ro"7nirnrl from rnrstriwti on a—aa a.nd not rpolaOed into narm! . If the operator's work changes from that stated in the notification specified above, this agreement is no longer valid and a new notification shall be submitted to the Department of Fish and Game. Failure to comply with the provisions of this agreement and with other pertinent Code Sections, including but not limited to Fish and Game Code Sections 5650, 5652 and 5948, may result in prosecution. Nothing in this agreement authorizes the operator to trespass on any land or property, nor does it relieve the operator of esponsibility for compliance with applicable federal, state, or local laws or ordinances. This agreem becomes effect i o Pptember 1 Z and terminates `OOot_ sober 31,1976 Operator_ i De ent Repm entative Title Public Works Director Title PatrolLieutena.nt Organization Contra Costa County _ Department of Fish and Game, State of California Date._ July 20 , 1976 Date June 7, 1976 _ 4Y Microfilmed with board or,..er FG fOFO n>mv i RECOMNIEl DA';!;IONS 1. Disturbance or removal of vegetation shall not exeec.:i sary to construct barriers or ells. If work in the lake the minimum necessary to complete operations. The is :.0 a,eidable, a curtain enclosure to prevent siltation disturbed portions of any stream channel or lake mar of the Eike bcvond the immediate working area shall gin within the high- water mark of the stream or lake be installed. Tlie enclosure and any supportive material shall be restored to as near-their original condition as shall be removed when the work is completed. possible. 13. Silt settling basins shall be located away from the stream 2. Restoration shall include the revegetatioh of stripped or lake to prevent discolored, silt-bearing water from or exposed areas. - reaching the strea*n or lake. 3. Rock, riprap, or other erosion protection shall be placed 14. Preparation shall be made so that runoff from steep, in areas where vegetation cannot reasonably be expected erodible surfaces will be diverted into stable areas with to become reestablished. little erosion potential. Frequent water checks shall be placed on dirt roads, cat tracks, or other work trails to 4. Installation'of bridges, culverts, or other structures shall control erosion. be such that water flow is not impaired and upstream or downstream passage of fish is assured at all times. 15. Nt7ash water containing mud or silt from aggregate wash- Bottoms of temporary.culverts shall be placed at or ing or other operations shall not be allowed to enter a below stream channel grade. Bottoms of permanent lake or flowing streams. culverts shall be placed below stream channel grade. 16. A silt catchment basin shall be constructed across the 5. Plans for design of concrete sills and other features stream immediately below the project site. This catch- that could potentially impede fish migrations must be ment basin shall be constructed of gravel which is free approved by Department engineers. from mud or silt. Upon completion of the project and after all flowing water in the area is clear of turbidity, 6. When any dam (any artificial obstruction) is being the gravel along with the trapped sediment shall be constructed, maintained, or placed in operation, suffi- removed from the stream. cient water shall at all times be allowed to pass down- stream to maintain fishlife below the dam. 17. If operations require moving of equipment across a flowing stream such operations shall be conducted 7. An adequate'fish, passage facility must be incorporated without substantially increasing stream turbidity. For into any bander that obstructs fish passage. repeated crossings, the operator shall install a bridge, 8. Any darn (an), artificial obstruction) constructed shall culvert, or rock-fill crossing. only be built from material such as clean ,vaslied gravel 18. If a stream channel has been altered during the opera- which will cause little or no siltation. tions, its low flow channel shall be returned as nearly 9. Equipment shall not be operated in the stream channels as possible to its natural state without creating a possible of flo%vina live streams except as may be necessary to future bank erosion problem, or a flat wide channel or construct crossings or barriers and fills at channel sluice-like area. If a lake margin has been altered, it changes. shall be returned as nearly as possible to its natural 10. When work in a flowing stream is unavoidable, the state without creating a future bank erosion problem. entire streamflo-,v shall be diverted around the work The gradient of the streambed or lake margin shall be area by a barrier, temporary culvert, and/or a new as nearly as possible the same gradient as existed prior channel capable of permitting upstream and clown- to disturbance. stream fish movement. Construction of the barrier 19. Structures and associated materials not designed to and/or the new channel shall normally begin in the withstand high seasonal flows shall he removed to areas downstream area and continue in an upstream direc- above the high water mark before such flows occur. tion, and the flow shall be diverted only when con- struction of the diversion is completed. Channel bank 20. No debris, soil, silt, sand, bark, slash, sawdust, rub- or:' barrier constructio!i shall be adequate to prevent bish, cement or concrete or washings thereof, oil or seepage into or from the work area. Channel banks or Petroleumproducts or other organic or earthen material barriers shall not be made of earth or other substances from any logging, construction, or associated activity subject to erosion unless first enclosed by sheet piling, of whatever nature shall be allowed to enter into or rock riprap, or other protective material. The enclosure placed where it may be xvashed by rainfall or runoff and the supportive material shall be removed when into, waters of the State. When operations are com- the work is completed and the removal shall normally pleted, any excess materials or debris shall be removed proceed from downstream in an upstream direction. -from the work area. No rubbish shall be deposited 11. Temporary fills shall be constructed of nonerodible. within 150 feet of the high water mark of any stream materials and shall be removed immediately upon work or lake. completion. 21. The operator will notify the Department of Fish and 12. Equipment shall not be operated in the lake or its Game of the date of completion of operations at least margin except during excavation and as may be neces- five days prior to such completion. OOT OSP ,. tion Nell/ -`S1Z AGREEMENT REGARDING PROPOSED STREAM OR LAKE ALTERATION THIS AGREEMENT, entered into, between the State of Californi Department of Fish and Game, hereinate3 c %� I d the Department, and�/� '/j ����h' �7���% _ '- e ofj�-l'�'� ���CZ- , State of L' /�f> ^%/� hereinafter called the operator, is as follows: WHEREAS, pursuant to Section l of California Fish and Game Code, the operator, on the - rtf day of I U tl Q3L, notified the Department that he intends to substantially divert or obstruct the natural flow of or sub tanti ll change the bed channel, or bank of or use, material from the stjeambed ofr�he following water: ����t- t /��jy -/h F-I< n the County of „{J%c:ir C (25x/1 State of California, Se�7—T R-Zj:L/Z'0Z4'-"%�12. WH F EAS, the Departmby certifies that an inspection of subject Area was made on the. day of If> > _, 19 by the foiI wing Department personnel ACi9xJ/�-•` �f-` - S1 ���1U �,rJ/r7h Gt'�sfit�i)FZJ and it was ' determined that an existing fish or game resource may be substantially adversely affected by such operations. THEREFORE, the Department hereby proposes measures to protect fish and wildlife during the operator's work. The operator hereby agrees to accept the following recommendations as part of his work: Numbers �_2, % , � � /4Ce , 7 from the list of recommendations on the back of this page and the following special recommendations: 1. All work in or near the stream or lake shall be confined to the period s 70 O'-a4nCiF_5./ z• I f�!' �-�1'��0!-' !�)f.),�'X .S'f�l"�,t, l� �%' -r i.')f��t'�t=.!) ��`y rl'lcri!��= C'Y — �-i:;_ATL/L.G :5/L.. % .G'"lL C-'�' /�J/�'i/�i4'`_' L?.t.: ��[%,,ra="✓�,f� .lf"i .0 zv�f -L2 1- ,�';'---mow iz 7/-/ _�`/1i�'if�:-f.:L!/��iCr i/;til> A%�� ,,�/�c%.�C:f?� �t��"t=c>.'<:=:✓.7/J:UL t- �15/L✓i/ bF ,—f/t' Gc-- ,,tJ /-!'L'%Ll /%C7i(i //i/t CE`I-Z2 e,i) CY.`%L :Y . . 1E the operator's work changes from that stated in the notification specified above, this agreement is no..- longer o .longer valid and a new notification shall be submitted to the Department of Fish and Game. Failure to comply . with the provisions of this agreement and with other pertinent Code Sections, including but not limited to Fish and Game Code Sections 5650, 5652 and 5948, may result in prosecution. Nothing in this agreement authorizes the operator to trespass on any land or property, nor does it relieve th.•; operator of r ponsibility for compliance with applicable federal,.state, or local laws or ordinances. This agreem ecomes cffec L i ( a d.terminates ( �r Operator Depaetrnent Reprffljentntive , Title Public Works Director Title sjrg mization Contra Costa County _ Department of Fish and Game, State of Califomia Date— July 20 , 1976 Date lr-r_ Microfilmed with board order T' FG 1060 (12•73) • RECOMMENDATIONS r. Disturbance or removal of vegetation shall not excc:,i say to construct barriers or 911s. If wort: in the lake the minimum necessary to complete operations. The is unavoidable, a curtain enclosure to prevent siltation disturbed portions of any stream channel or lake mar- of the lake beyond the immediate Nvorkirig area slraIl gin within the high water mark of the stream or lake be. installed. The enclosure and any supportive material shall be restored to as near.their original condition as shall be removed when the work is completed. possible. 13. Silt settling basins shall be located away from the stream 2. Restoration shall include the revegetation of stripped or lake to prevent discolored, silt-bearing water from or exposed areas. reaching the stream or lake. 3. Rock, riprap, or other erosion protection shall be placed 14. Preparation shall be made so that runoff from steep, in areas where vegetation cannot reasonably be expected erodible surfaces will be diverted into stable areas with to become reestablished. little erosion potential. Frequent water checks shall be placed on dirt roads, cat tracks, or other work trails to 4. Installation of bridges, culverts, or other structures shall control erosion. be such that water flow is not impaired and upstream or dowmstream'passage of fish is assured at all times. 15. Wash water containing mud or silt from aggregate wash- Bottoms of temporary culverts shall be placed at or ing or other operations shall not be allowed to enter a below stream channel grade. Bottoms of permanent lake or flowing streams. culverts shall be placed below stream channel grade. 16. A silt catchment basin shall be constructed across the 5. Plans for design of Concrete sills and ether features stream immediately below the project site. This catch- that could potentially impede fish migrations must be ment basin shall be constructed of gravel which is free approved by Department engineers. from mud or silt. Upon completion of the project and 6. R'hen any dam (any artificial obstruction) is being the gravel along with the trapped sediment shallUe after all flowing water in the area is clear of turbidity, l constructed, maintained, or placed in operation, suffi- removed from the stream. cient water-shall at all times be allowed to pass down- stream to maintain fishlife below the dam. 17. If operations require moving of equipment across a 7. An adequate fish passage facility maflowing stream, such operations shall be conducted st be incorporated without substantially increasing stream turbidity. For into any banter that obstructs fish passage. repeated crossings, the operator shall install a bridge, 3. Any darn (any artificial obstruction) constructed shall cuh-ect, or rock-fill crossing. only be built from material such as dean Nvasbed gravel 13. If a stream channel has been altered during the opera- which will cause little. or no siltation. tions, its low flow channel shall be rei.urned as nearly 9. Equipment shall not be operated in the stream channels as possible to its natural state without creating a possible of flowing live streams except as may be necessary to future bank erosion problem, or a fiat wide channel or construct crossings- or barriers and fills at channel sluice-like area. If a lake margin has been altered, it changes. shall be returned as nearly as possible to its natural 10. When work in a flowing stream is unavoidable, the state without creating a future bank erosion problem. entire streanflow shall be diverted around the work The gradient of the streambed or lake margin shall be area by a barrier, temporary culvert, and/or a new as nearly as possible the same gradient as existed prior channel capable of permitting upstream and down- to disturbance. stream fish movement. Construction of the barrier 19. Structures and associated materials not designed to and/or the new charnel shall normally begin in the withstand high seasonal flows shall be removed to areas downstream area and continue in an upstream direc- above 'the high water mark before such'flows occur. tion, and the flow shall be diverted only when con- struction of the diversion is completed. Channel bank 20. No debris, soil, silt, sand, bark, slash, sawdust, rub- or barrier construction shall be adequate to prevent bish, cement or concrete or. washings .thereof, oil or seepage into or from the work area. Channel banks or from i)roducts or other organic or earthen material barriers shall not be made of earth or other substances from any logging, construction, or associated activity subject to erosion unless first enclosed by sheet piling, of whatever nature shall be allowed to enter into or rock riprap, or other protective material. The enclosure placed where it may be washed by rainfall_ or runoff and the supportive material shall be removed when into, waters of the State. When operations are com- the work is completed and the removal shall normally pleted, any excess materials or debris shall be removed proceed from downstream in an upstream direction. from the work area. No rubbish shall be deposited 11. Temporary fills shall be constructed of nonerodible . within 150 feet of the high water mark of any stream materials and shall be removed immediately upon work or lake. completion. 21. The operator will notify the Department of Fish and 12. Equipment shall not be operated in the lake or its Game of the date of completion of operations at least margin except during excavation and as may be neces- five days prior to such completion. OT 05P C C In the Board of Supervisors of Contra Costa County, State of California March 16 , 1976 In the Matter of ` In the Matter of Approving Agreement with the California Department of Fish and Game (Bear Creek Road Realignment Project No. 2351-4282-76, West County Area) (Pinole Creek) IT IS BY THE BOARD ORDERED that the Public Works Director is AUTHORIZED to execute an agreement with the California Department of Fish and Game defining the conditions and manner in which the proposed construction work is to be performed in a section of Pinole Creek adjacent to Bear Creek Road,. West County area. PASSED by the Board on March 16, 1976. Z1 hereby certify that the foregoing is a true and correct copy of an order entered on the minutes of said Board of Supervisors on the date aforesaid. Witness my hand and the Seal of the Board of Originator: Public Works Department Supervisors Road Design Division affixed this 16th day of March 19 76 cc Calif. Dept. of Fish and Game J. R. OLSSON, Clerk via Public Works Department ByDeputy Clerk Public Works Director N. Ing ham County Auditor-Controller H 24 8/75 10M . �otifieation No. 111-028-76 AGREEMENT REGARDING PROPOSED STREAM OR LAKE ALTERATION THIS AGREEMENT, entered into between the State of California, Department of Fish and Game, hereinafter called the Department, and T,.,T.Reagan oYl'.1_r _ pmt-3 CO.P1dbl.l�_JPL4.YliS__IZP�t of C n C n.C o. , State of Cali f_ , hereinafter called the operator, is as follows: WHEREAS, pursuant to. Section 1601 of California Fish and Game Code, the operator,,on the 20 day of Jan , 1976, notified the Department that he intends to substantially divert or obstruct the natural flow of, or substantially change the bed, channel, or bank of, or use material from the. , streambed of, the following water; Pinole __in the County of •, Contra Costa , State of California, S T -R WHEREAS, the Department hereby certifies that an inspection of subject area was made on the 2nd day of Febrisa-rar 1926—, by the following Department personnel: F]an1k S Russell Fish and Gam . Warden ___ and it was,':;,. determined that an existing fish or game resource may be substantially adversely affected by:such operations. THEREFORE, the Department hereby proposes measures to protect fish and wildlife during the operator's work. The operator hereby agrees to accept the following recommendations as part of his'work: Numbers - # from the list of recommendations on the back of this page and the following special recommendations: 1. All work in or near the stream or lake shall be confined to the period Item #16 shall be placed below both construction sites , shall- be constructed of washed rock 2"to " in size and shall be placed the width of Pinole creek and aprox_3 ft inwide and 3 ft high. ALL CONSTRUCTION WORK SHALL BE COMPLETED BEFORE HIGH SEASONAL RAINS, If the operator's work changes from that stated in the notification specified above, this agreement is no longer valid and a new notification shall be submitted to the Department of Fish and Game. Failure to comply with the provisions of this agreement and with other pertinent Code Sections, including but not limited to Fish and Game Code Sections 5650, 5652 and 5948, may result in prosecution. Nothing in this agreement autborires the operator to trespass on any land or property, nor does it relieve the operator of re ponsibility for compliance with applicable federal, state, or local laws or ordinances. This agreem ecomes effective on 2 11926� and a 12-1-76 Operator _ , _ ,� rank S Russell Department Representative Title Title_ ���i Title Fish & Game Warden Organization/ f� �t / Department of Fish and Game, State of California Date –� 9_ � Date,�Pb 2. 19]6 Microfilmed with board order. Fc. ineu ra.�ai RECOMMENDATIONS , 1. Disturbance or removal of vegetation shall not exceed. Bary to construct barriers or fills. If work in the lake the minimum necessary to complete operations. The is unavoidable, a curtain enclosure to prevent siltation disturbed portions of any stream charmel,or lake mar- of the lake beyond the immediate working area shall gin within the high water"mark of the stream or"lake— be installed. The enclosure and any supportive material shall be restored. to as near,theii original condition'as• shall be removed when the work is completed. possible. 13. Silt settling basins shall be located away from the stream 2. Restoration shall include the revegetation of stripped or lake to prevent discolored,..silt bearing water from, or exposed areas. reaching the. stream or lake. 3. Rock, riprap, or other erosion protection shall be placed 14. Preparation shall be made so that runoff from steep, in areas where vegetation cannot reasonably be expected erodible surfaces will be diverted into stable areas with to become reestablished. little erosion potential. Frequent water checks shall be es culverts or other structures shall placed on dirt roads, cat tracks, or other work trails to 4. Installation of bridges, control erosion. be such that water flow is not impaired and upstream or downstream passage of fish is assured at all times. 15. Wash water containing mud or silt from aggregate wash- Bottoms of temporary culverts shall be placed at or ing or other operations shall not be,allowed to enter a below stream channel grade. Bottoms of permanent lake or flowing streams. culverts shall be placed below stream channel grade. 16. A silt catchment basin shall be constructed across the 5. Plans for 'design of concrete sills and other features stream immediately below the project site. This catch- that could potentially impede fish migrations must be ment basin shall be constructed of gravel which is free approved by Department engineers. from mud or silt. Upon completion of the project and 6. When an dam (any artificial obstruction is being after all flowing water in the area is clear of turbidity, y (° y ) g the gravel along with the trapped sediment shall be constructed, maintained, or placed in operation, suffi- removed from the stream. cient water shall at all times be allowed to pass down- stream to maintain fishlife below the dam. 17. If operations require moving of equipment across a flowing stream, such operations shall be conducted 7. An adequate fish passage facility must be incorporated without substantially increasing stream turbidity. For into any barrier that obstructs fish passage. repeated crossings, the operator shall install a bridge, 8. Any dam (any artificial obstruction) constructed shall culvert, or rock-fill crossing. only be built from material such as clean washed gravel 18. If a stream channel has been altered during the opera- which will cause little or no siltation. tions, its low flow channel shall be returned as nearly 9. Equipment shall not be operated in the stream channels as possible to its natural state without creating a possible of flowing live..streams except as may be necessary„to ...... future bank erosion problem, or a flat wide channel or construct crossings or, barriers and fills at channel sluice-like..area. If a lake margin has been altered, it changes shall be returned as nearly as possible to its natural 10. When work iii'a flowing stream is unavoidable, the 'state without creating a future bank erosion problem. entire streamflow shall be diverted around the work The gradient of the streambed or lake margin shall be area by a• barrier, temporary culvert, and/or a new as nearly as possible the same gradientas existed prior channel capable of permitting upstream and down- to disturbance. stream fish movement. Construction of the barrier 19. Structures and associated materials not designed to and/or ke 'neiv;channel shall normally begin in the withstand high seasonal flows shall be removed to areas downstream area and continue in an upstream direc-, above the high water mark before such flows occur. tion, and ;the flow shall be diverted only when con- struction of the diversion is completed. Channel bank 20. No debris, soil, silt, sand, bark, slash, sawdust, rub- or barrier construction shall be adequate to prevent bish, cement or concrete or washings thereof, oil or seepage into or from the work area. Channel banks or petroleum logging, or other organic or earthen material barriers shall not be made of earth or other substances from any logging, construction, or associated activity subject to erosion.unless .first enclosed by sheet piling, 'of whatever nature shall be allowed to enter into or rock riprap, or other protective material. The enclosure placed where it may be washed by rainfall or runoff and the supportive material shall be removed when into, waters of the State. When operations are coin- the work. is completed and the removal shall normally pleted, any excess materials or debris shall be removed proceed from dowirstream in an upstream direction, from the work area. No rubbish shall be deposited 11. Temporary fills shall be constructed of' non-erodible within 150 feet of the high water mark of any stream materials and shall be removed immediately upon work or lake. completion, , , 21. The operator will notify the Department of Fish and 12. Equipment shall not be operated in the lake or its Game of the date of completion of operations at least margin except during excavation and as may be neves- five days prior to such completion. i IE In th® Board of Supervisors I of P i r Contra Costa County, State of California March 2 , 1976 — i I In the Matter of I In the Matter of Approving Agree- ment with the California Departmen of Fish and Game (Park Avenue Bridg Project No. 1065-4526-72, East Richmond Area ) Wildcat Creek) I IT IS BY THE BOARD ORDERED that the Public Works Director is AUTHORIZED to execute an agreement with the California Department of Fish and Game defining the conditions and manner in which the proposed construction work is to be performed in the section of Wildcat Creek at Park Avenue, East Richmond area . PASSED by the Board on March 2 , 1976 . I hereby certify that the foregoing is a true and correct copy of an order entered on the minutes of said Board of Supervisors on the date aforesaid. Witness my hand and the Seal of the Board of Originator: Public Works Department Supervisors Road Design Division affixed this 2nd day of March 19 76 cc : Calif: Dept . of Fish and Game J. R. OLSSON, Clerk Public Works Director BY JDeputy Clerk County Auditor-Controller N. .InEwaham H 24 8/75 10M J � • / . `. 6tification No. AGREEMENT .REGARDING PROPOSED STREAM OR LAKE ALTERATION THIS AGREEMENT, entered into between the State of California, Department of Fish and Game, hereinafter called the Department, and of State of -%1' ' +' ` hereinafter called the operator, is as follows: WHEREAS, pursuant to Section '!_ of California Fish and Game Code, the operator, on the ° 2 day of —, 19 notified the Department that he intends to substantially divert_ or obstruct the natural flow of, or substantially change the bed, channel, or bank of, or use material from the streambed of, the following water: - �„ '?^ _ _--_in the County of �- State of California, S T R Y WHEREAS, the Department hereby certifies that an inspection of subject area was made on the day of ''' 19', , by the following Department personnel: ' ? ,,�_ 7 and it was determined that an existing fish or game resource may be substantially.•adversely affected by such operations. THEREFORE, the Department hereby proposes measures to protect fish and wildlife during the operator's. work. The operator hereby agrees to accept the following recommendations as part of his work: Numbers from the list of recommendations on the back of this page and the fnllowing_special.recommendations: 1. All work in or near the stream or lake shall be confined to Vie period j'�'_�1Y'C:".t:`?. c '_= 0 0 i I_•t:f:'l .t� �i'tlfl L 1 4';.^-. "t).'.^(°6L-I i�(a'n•>c- 77`7 l^.€:"P•Fi'i:7"7(?.i:.i ^^ i:i r,.i. _,i'1^T! � -. _ tai '; �' '.II:1'�(� u (i�"1 f.9 '.l� C'!' _ �'r'li,!?•r Vit, Flo „'^�,��•T 'P".f:� .ly S'I I}i�: � � ' ' •�--1C? ...>� ��,- 'tiJ.=C:3C� 'C�ai"� � ti's:)"i� �f}1' 1^i 'i' ( C`�7. -,. If the operator's work changes from that stated in the notification specified above, this agreement is no longer valid and a new notification shall be submitted to the Department of Fish and Game. Failure to comply with the provisions of this agreement and with other pertinent Code Sections, including but not limited to Fish and Game.Code Sections 5650, 5652 and 5948, may result in prosecution. Nothing in this agreement authorizes the operator to trespass on any land or property, nor does it relieve the operator of esponsibility for compliance with applicable federal, state, or local laws or ordinances. This agreem becomes effec ' e and terminates Operator �—Department Representative Tltle�P^ 1 n;-':c :' PTitle Organization ra Department of Fish and Game, State of California Date '..:• a car, Date .Microfilmed with board order FG 1060 ((2-73) I CONTRA COSTA COUNTY TO Clerk- 0 `f6, BC0,YJ • -0 FIA 3(3/76 FROM�O�I.G� I� IQ VI SUBJECT 1 ��'1 � Gam P_ /TG 1'VL+ '�ti�rk {4v<. (O65-026--M ;&'ta ,604 SIGNED r PLEASE REPLY HERE TO DATE RECEIVED fl,u.R 1976 J. R.•OLSSON CLERK UO O: SUPERVISORS RA STA CO. By-..... .... -.De ut SIGNED INSTRUCTIONS -FILL IN TOP PORTION, REMOVE DUPLICATE (YELLOW) AND FORWARD REMAINING PARTS WITH CARBONS.TO REPLY,FILL IN LOWER PORTION AND SNAP OUT CARBONS. RETAIN TRIPLICATE(PINK)AND RETURN ORIGINAL. FORM M 103 In the Board of Supervisors of Contra Costa County, State of California December 16 , 19 75 In the Matter of Consulting Services Agreements for Foundation Investigations Prof . No, 3971-4301-769 Clayton Area; Prof. No. 1065-4526-72, Richmond Area. IT IS BY THE BOARD ORDERED that the Public Works Director is AUTHORIZED to execute an agreement with Peter Kaldveer and Asso— ciates to provide for foundation investigations of Marsh Creek Road Bridge, Clayton area ($3,200), and Park Avenue Bridge on Wildcat Creek, Richmond area ($2,700), said amounts not to be exceeded without prior approval of the Public Works Director. PASSED by the Board on December 16, 1975• I hereby certify that the foregoing is a true and correct copy of an order entered on the minutes of said Board of Supervisors on the date aforesaid. Witness my hand and the Seal of the Board of cc: Contractor Supervisors Public Works Director affixed this16th day of December , 19 73_ County Auditor—Controller J. R. OLSSON, Clerk ��w��`ho-c.M o e-, Deputy Clerk Rondalynrl Shackles H 24 8/75 10M -- Coru;11. Conu .t,:i.0ll: `.� 1,,, 5./ 1'e 1*i:L't)t!C ]..i.0 Pr[;(3itcy : COUNTY OF CONTRA COSTA b ), Con u.ltanI; ' s .iiltac G Peter Kaldveer.' b Associates ( Acad.rc:�s : _ Portobello Office Center, Eleven Embarcadero West , Oakland , CA 94607 _ December 16 , 1975 ( u) Proicct ilatai , t :tur.l'.)e2•, Loc at:Lon : Park Ave. Bridge (1065-4526-72) ,� Ffarsfi ree rB-idge (39/ I-43ZT--761 ( (: '1 FVI?10nt L:Lr,I .i; : $2,700 _ Park Ave. Br..idge $3,200 - Marsh Creek Road Bridge 2 . L; L'. `i.'hesi, :;] � t '- t ' -t C, p `- r ' ' - ", , � } • , la�..tl'C'3 at, es the nrl.l S £1(,i'rcl:, r1 i, lcIet,0 1111 1� - (DCS_L(;n�FLt_0 0:If1Cial Capacity 1r1 buslncsS3 r•.., a. r• V VCIL(: O1 Gulj.fOrrt.LC ) JJ 1 .- r s t � f 11. .iit'1 ) on(, �. Costa County :tC1:i,G,l.i-�;✓bCiili:.,� ! CC ;)11.;0 . 7 ; Lle In tOer11'1C person JOVC or on.3uan , Imo l s Lil(11 .' Lbefore i;;C3ulp 'L;Olay anC., a c1:"]l OVileCl,;e Ct ti)at No si nDd it and t/lit the corporat ;_0.n 01" 0211tillCr`'' n£ll;led above' o.:ecULed1 the C1ltili I1 11iStrU '.2I1 pUrsUcaClt to its -1 Or 1'e,Oluti on of its IiO lrGsnilekiardLiltl7e�tbtryl+ e!eteutenerunnnm_ OPPTIAI, S1'.AL 2 at �� , DANIEL L. MITCHELL ,' I NOTARY PUBLIC CALIFORNIA ALAMEDA COUNTY 1, )t aryP Ui)li C R MY Commission Expires Sept.26.1917 •.�,. EIIIIIIIIIIIISIII 111111111111111ltllllllll 111/1111 ttt tll 1. 111CtOT' 1 Sauer Jolin B. Clausen COUI! 'r " I i t,; G'G'Li.�s.. Put)liC/ 'lor1(s Direc ..61 511 r 13y : Deputy L;y ,% L`aiLC ��Q.i!!'��' _� De1)uty 3. P01`t).0 i fect:LVC on elle abovo (lat- , tile above-nai ed PUC)lie AL;e'ncy and Consultant r,UtuL111v aP;r'Ce and p:rG:.i:.S' as fol].01'd6 . !i . 1.GIO10`iLiellt; . Public i°11; nC; / 11CrCby ei )loys Con_,ultant'. , an(I Con,,ill ;":L aCCei)ts such omoloy-meni; , t0 pe ).°form the professional :JervicoC i (de:sC1'1.b(3C1 flercirl) U )on t1ic teri'ls an Ci In ConsideralLion of the payments .`.itat;CCi nere- :? , 5 . Scoot, of Lie1'yice SC01)e 01 scrV i CC s'laII be, a:. UC sCl'1b3C: in !'•.pPei:_:i x attac'iec ncrcto. 6 . 1I1r15L 'an('C Th71 Coi1:;U ant, s fall, at; no e}:1):)nsb t0 Public A, el'C y fur'll-I ih C(;'1'tificates Oil 01111(?r c.- l(loncc accept;.Ible to abliC '1.f;ency of � pLtbL''.c liat):Ll i t;y in,: .traiiCC Of 'a .LCa,;t :p j0 , :)� for a.1i. C al;ia :, a_''l:i:L:I Ola' of bouily injuries or death' to any one l)erson and at le:3.r,t :; 00 , 000 fc ' tr:o oI' i; oro T)^": Ciot1:. ill one aCC:L(tent oi' OCC1.1"t'I'enCe " an'd ( l) ) prOpel"tj 1.1itL)11.LL\' 'Ln' U .l.t1Cc3 .OrOV.L(1_Ilic _02' a 1'_r1-LI, o'. rio" le' T nan .l j(; �v� . Ciaysl notice Of policy lapse oT' Cancr.,Ilation is 7 . PiEz'l :llt . PiJI iC AIrrency shall pay Consultant foT profess-ional CervIc3s perfor::ied at ti1C fate,, silUt']11 111 ij attached n'CretO, Ci..^.1CIl .includ all overilf,aCi an(i inciCt(3ntal e);pnrtsr3,s , for Vlhicll n0 aCtClitional CO 1j)31:sL ' ion shall 03 allor:redi. In tic) c,vent shall the total a;.lGunt rai(i to -.-he Coilsul.tant; oxcccda the p2).VL1ent in Se(, . _L (e ) `.i1 i:GUL 0r10r Yi2'1ttC:i a';);�Y'OVL i- Of tilel.OI7tI'<a O t l C;OU!'lty Pul)lic 1!oO,!:z, DI rcc' or o `. t .r_ 1� �. -C nvei:ier!.; int:'ef,v 1.� . o;:;;alt.ant C,I,atcmen OI. cl-1 r-ec; s.la-1-L lie Sui)';1:Lt i. C: at CO 1) "t, 11 b i"I;l.(Ia V1:I.ti-i a,rl t;flirty 0 ) clays afuer rt_-,ce:�})t 0 f e-ac :;tu.'..e m.Clli: . 8. eY.1:'.'i.1In.i; ion . At its UU%:Loll , I�uhl -tc i�.( i!li(:y may tel'': 1T:at;C tn:L3 T O- ii?:^.1"l 1; Eli; Rl']V t11:1C) b`7 1'11':LttCll 1?G1:,.LCc t0 t}1C'' Con r..l.t It;al'l 1-; , l'laCt;1�:)r Gr i!Ut tilt'. CUi'l�U.L I;LLI 11. i:i .L 1: t0 i1)C' ':1GI Ct;di::'Cl :J,% Or LII(10::' ll i.,, CO1-!1;1'01 iIi' t}lai; ta.i": , <1:C1 l'l11.i. ii0 I),L1(l, :i:i.1;'.10'•., U11 i11C i .... .. , a1l air,OL1., ouc or ti, _ I)t' :,1:L11 (').lw on acco ..'..11; O . 0 .. `i t0 i;;... C'1clt(_ U t(:rll'-Ila1;_Oii.. � . •i;; .i;ll' �'�.'1C 1.0:1 -1].i '?.rlt; iitl 111(1.: ,)i;I,CIC!"11; l:0[1i;1 ...:i;U1' , i'.n:, l:, not ,.0 be Lc t: .li(.CI'ir1'!. i�:i.(..ai.l. :LCI!l . ;tU (;O ., .�l 1,_111 :.,ilc. '".i.. 11G- 11.11(1 0:11 11a: ...li�.; '. i.'1.1t;.L:i C A(;c•t1G;/ I' ll"!lii?c,ll :LCy hoS' rl;i,r "l,1i:. ;i Ol' d%.li.:�,�.,•';, ;..L:'1G_ili' !]'011 G1 CO; nCC;„ ;1.1 Microfilmed with board order APPENDIX A NOV'E DU al Consultants Geotechnical U5 "i915 � PUBLIC WORKS DEPARTMENT PORTOBELLO OFFICE CENTER ELEVEN EMBARCADERO WEST, OAKLAND, CALIFORNIA 94607, 415/839-1680 November 3, !97.5 PK-119, O 5504 Mr. `victor Sauor Contra Costa County Public Works Departrnent 5th Flats, Administration Bid-. Aliartiriez, `•.:alifornio 94553 Attcnticn: Mr. Larry Reagan RE: POUNDATIOl',; IN�'ESTiCA,TIOi� PARK AVEh.JUE AND MARS; ROAD BRIDGES CONTRA COSTA CC'1J":Ta, ,^-,!iFORNI.^ In accordance with your request, we are ;Teased to submit the fo lotivir1(, provosa, i'e perform foundation investigations for the proposed Park Avenue cnd 1 iursr- Cie'c!< Road Bridges to be constructed in Contra Costa County, Cai i forma. Cu;- ;:i-oposc! .5 ;rased on project inforrnation furnishes.' to is b; 1'lie CUnira Ccs;a l.ouni'y PuE,I!C 'iVori Department staff, a review of available surface i ,i subsur�ace information i'o'i `ihJ two bridge locations and our visits to ine two sites. Park avenue Bridge The Par T: Avenue Bridae will be constructed ro replace tine existing bridge' which „rJSses Niildcoi Creek.approximately 5CO feel west of the intcrsecticn of Park Avenue wirh Ock Street near the city limits of Richmond. !t is our undersi'anding that The rew bt-idgc wiil be a two-lane "Super-Span" type steel bridge. T he bred,,^y;: wll l span a disfewic'-_ of Gppro;,i-5ia.,f.Y 30 i�'eI by approxi Mr+ely 3-0 feet high and extend for <1 C: :"q',;C:". of oboe. /0 feCt C!'Jny i e ioadwoy. The Site o7 the, proposed crossing i5 a narrow canyon miich (las been formed as ',`Yrildcat Creel< CT t!;rouch various Fliocene non-marine ceposi`s. These materials vcr consld2r3blY and ,.cn range from clo'y's and and 5,7nd5 to rocks and boulders. Botk StdeS .Ot the canyon cre rrlode.-.-tely steep and subpct to londsliding. Al- the lime of uu site visit, atone-lone cnncrete bridge wcs being used to cross_ the _.reef,. Microfilmed with board order ^ PEND I X A -6i • f 3 Contra Costa County November- 3, 1975, O 6504 Page 2 Marsh Creek Road Bridge The propcsed .Marsh Crec"- hood Bridge will carry traffic over Marsh Cree. opprox;kmately 1,500 feet east of the intersection of Marsh Creek Roacl with Deer Valley Road in tl,e easteir. end of Contra Costa County. It is our understanding than either o "Super-Spun" type bridge or a conventional single span concrete bridge are being considered. IF o 5' pc''r' S7C.^." bridge IS USCd, It Will be apprO::ImCtaly ihL Sale Size as the PGri< Avenue $ridge, if a cenventioncl simple span concrete bridge is Us d, the bridge v✓ill span approximately 111 feet from abutment to abutment. The Marsh Creek Road Eridge will be constructed in an area of gently rolling terrain wiih minor vegetation except for scattered trees.. The bridge site is likely underlain by alluvial materials which in turn are underlain by sandstone of the Joaquin Ridge Formation. At the time of our site visit, a narrc-Y,r two-lame steel bridge was used to cross the creek. Based on the expected Foonddi ion cunditions in the proposed bridge locations and the anticipated bridge loads, we recommend the following scope of work for each of our foundation investigations: I . Perform a field SUbsurface exploration program for the proposed bridges under tI~ie d:rL'Ctl,^.n GF our SOII r`;nglnCCr wil0 1VOUid SUp:7rV 1Sc, log lJt,d SGfYlpl c: f. i;G{iilllilOUi f11�1'i auger or rotary wash borings that will be extended to a maximum depth of about 70 feet. Relatively undisturbed samples would be recovered from the borings using the ;Moc!iFicd California Sampler as well as thin-wull Shelby Tu'.)es, as required. In addition, the Standord Penetration Resistance, in which a 2-inch O.D. Split Spoon Sampler is driven 1.5 feet wiih a 140-pound hammer falling 30 inches, will be determined of selecied depths in each bo *ng, The Standard Per-.ciraiion Resistance. provides a 1.oUgh eiillfif,Le er in-piace Strength of granu!ai' sO:ls and permits sump!es to be. obtoined fOr CIUSsi flcC:tl•�:`1 r_nd laboratory testing purposes. We would also ocrform forvane and nentrorn^rer tast; in the field and npprcpi-iote clayey scmp?es recovered from the boring,. 2. Laboratory testing of "relatively" Undisiurbed samples as well as bulk sarrp!cs ob aired from the borings. This would include classification, index, and strength testing as required. 3. Soil e-nglnecring an,,ily5;s and .vrj:uation of -;Ihe resulting field and laborot_cry test data, .4 ,CiUbC";It1Cil O'i our fOUnd,::i-ions investigation repori presenting, as applicable, but not „<:cessari!y limited to tho following: o. Physico: properties and charocieristics of the matisria11S underlying file site. Appendix B PETER KALDVEER ANL` ASSOCIATES SCHEDULE OF CHARGES e, TERMS PERSOINNEL CHARGES CMrgrs for employee.cre compulad by r:iultiplyinq thv foie! direct ;nio" cos' of o. person,,::! by ;v:o ord one half. The total direct sa!ery cost shell oe n sura equal to the direct payroll cost (co,npl,ted on e r�;p;:0 a.;nua! hasis o•,d erpres:ed as an average hourly ro'S?alas poyl-oll toxe;, nSWOOCe incident to employment, holidays, sick Icovc, wceton;, etc. EG'UIPMENT CHARGES ._._._._________.. A.v'cma N•a equipment Mobile loborotory with compaction control equipmmst and vehiclos, per hour....... 52.50 Nucieor moisture-density gunge, net rost..........................................$4.^,0 . EngineerinY3 Computer Services Use of pror�raa:, compu;er cnd peripheral equipme=t Sillcd of !.5 Hmo, .he J;,ect reotol rates for lite equipmc•,t, This chorge i•,cludes pen,nate, cieveleprnent-ur moi,,le•wnce of the programs. MISCELLANEOUS CHARC-.S �app I .) I 0 "k-•Hili • r'_A• PEFf tF. 1_• •3'i•'p!�w'Ta�,'?'+1iT+'�� ��7 [.-ia IN'-IC^1 CI'.d rental e;'T'T'�.'V' —1,.,4 costs arc billed at cost plus 15 pereant. Drilling services perfornmd for Peter Kcldveer and A.ssncictes will be cl:orc:ec at cost. Speciol equipment such as szlsmncrank, mogrctomater, vibregr_.nd reclslivit, meat or slop^ indicctor r inclinomctew;ll be chc:ycd c' cost. .r_. .I t .t_. _ Fig :,. r. -� :111 ::I_. _. <:n i,:, :_ Ilia 4 LIABILITY Gancral - We are protected by `No;'.:men's Compensation Insurance (c,,,!,/a• Employer's Liability !-,suronw/, and by Publ;c L;cb;I;ly nsT uri,ce for bodily i•,ju,y a,d nraperty damoge with a combined 1'mit of $!,h00,0^^,0.^., o��J •::iG furnish cerr:f;cnies rhe,ecf apo-, requc;t. lie ovine the list, of dornnge to out o. n supplies onJ eyuio:uant. I ail f B;b4I 7`;d, .11 - Icy• G' •••.e-f:LMe ="s-- Limitations The Client recag,izei the inherent risks connected with construction. In nerformi•,g 'heir pr ofa rsio•,aI sere;ca,, Pe tel Kold veer and Assuciafes will use Blot degree of rare and skit; ordinarily exercised, $;Milo; rircumstunr!;, by roputonie mnrnbers of •heir ;-ofessio- prectic'ng i^ the some or simi!or !occlity. No other•..erranty, express or irnpli^_d, is rondo Of inteudrd by t'ne prc:po-cl for consult;ng services or by Furnishing oral or written reports of the findings made. .. - . .;,._-_ .'.... .. . _I 1.2,_.,.t_ PA fa- ; y� c J - 4. _ .. .. _ ' ib Is 06pbi - , _ .. , _ 1 .tjori irieieeo, 94 at r/ _a:_IJ. _ 1 n-._.:_.a r r__ ._�.: .I. _...._._. TE2MS Invoice; For our services wi!I be submitted at our option, on a monthly basis or when tee work is completed. Invoices vrll b:. due ;mmedicrely, but ..,ill not be?elinauent if paid on ar before ilia 101b day following the cad of the mentlh during s•:hich Ihu invoice is noted. .__. ..,__.J_ _ .tip.:__ _L_.__ ..:n s_ a... __ .1._ _ - _r n.. ,. 119 gL14 t,.y ...1 f,-,, � u� �r r1.a j-1!1 11,02 ___ pQ,L� If suit is fi lcd, a reoso" hi cn citolney's fee, to be set Ly^the court, and ,-,thee costs i.,cured in co!lecring any delinauent arcaunt, shall be i-,eluded in any judgenhcnt in fovor of Peter Kc;-weer and As.ocio!es. In the ever,- the Clio:-.r mal-as r. Brim cr brings an action neain;' Pour Ka!dvccr'o,,d Associo;c; for cny act ori;;ng out of the perforrrlunce of his professional services, and the Cl;"t foils to prove such claim or acrion, rhea the Client shall pay all lcpol and o'her costs incurred by Peter Koldveer and Associotes in defense of such claim or action. MP!ES All Samples Cf sril and roti: 'aili be destroyed 20 day^after ;suuancu of our cf-ort anlc^S4 you cdvise..s ctharwrise. Upon ruyuF:.r, we.,ill deliver smnples to you, charges collect, or we wiii store them for you for nn earned sro,ago chcrga. 7- APPENDIX A t �' • f Contra Costa County November 3, 1975, C 6504 Page 3 b, Foundation design recommendations for various types of foundations including deep foundations such as piles or caissions, if necessary. c. Design recommendations for bridge excavations and backfill . Our services would be provided in accordance with the rates and :elms shown on our standard fee schedule a copy of which is printed on the reverse side of the last page of this proposal . We estimate that the cost of our foundation study for the Marsh Creek Road Bridge will range between $2,800 and $3,2CG and We would not exceed the latter amount without your prior approval . Because of the uncertcir:ty of the sub- surface conditions at the Park Avenue site, the costs of our foundation invest- cation for this bridge could vary considerably. If alluvial-type materials are encountered and the drilling of the exploratory borings goes reasonably well , then we ` estimate that our cash v✓bold be betr een $2,400 and $2,700. However; if boulders,. and rocks are encountered resulting in difficult drilling, our costs could rise to between $3,200 and $3,600. We should note that this esiinicte assumes than Contra Costa County will supply the locations of all underground utilities in proposed 'boring I ocations and will secure any necessary access permits. f, ! s s s ! w.., od r � b` Our pr.,,:SSlbna, Cr`.'Ii.e� ��C!� .,c p�rforrii�. , our in is lilt$ v ,alnGa and 0::. r�i:0i�u:�iendatiOnS prepared in accordance with generally accepted 'engineering principles and practices. This warranty is in lieu of all other Warranties either expressed or implied. We anticipate that, after receiving your authorization to proceed, we would start our field wor!< within }via or three drys. We propose to complete our study wi"'in three - ond one half and four and one half weeks. We thank you for consideration of our firm and lab!: forward to being of service .to you in this prc:e--. Very trul,v Yours, PETER KALDVEE? AN : ASSOCL6,TES Peter Koldveer PK:smb Copies: Addressee (3). Accef ted By Date APPENDIX B 21 0 f 3' Sefrternu..r10, 1975 • PETER KA) DVEE1,, AND ASSOC!ATEI S CC IE D U L E CF CHARGES FOR L.AA 3 0 P�A T 3 RY TESTS Unit charges 'c;r Icbotator'� testing include the rioniial fcbm-ctwy wnf(. and reporting of results only. Unusual, special or time-c4n>uminq 5ai;,p!e Preparation or special tests are billed at our latest hourly fee schedule rotes. Chara2s fer tests which are net listed will be given upon request. Speciai consideration will be giver, for large nurr.b,-,,s of tests. A. CLASSlJFlCATlCN/:NDEX PROPERTIES 4'/zj4er Content cn-2 Visual Clcssijlcation (USCS) (ASTM-D2216, D2487) ;.50 Dry 'Jnit We;Qhs Yith Wc;rer "ntenr 6.CO 3. Strength by Tcrvane or Penetrometer !.10 4. Afterberg � Limits ;ASTM `?233, D42-4) 35.00 5. Shrinkage Limit (ASW D427) 22.00 6. Specific Gravity (ASTM D854) (in dupiicoe) 22.00 7. Sieve Analysis, Dry (ASTM 0422.) 20.03 B. Sieve Analysis, Washed (ASTM D422) 30.00 9. Hyd!ornerer Analysis (ASTM D1:40) 30.00 10. Combin-!d Anc:ysis, Washed Sieve Plus Hydrometer 60,00 11. Sand Equivalent (ASTM D2419) 20.00 12. Wash Through Ho. 200 Sieve 10.,00 B. COMPACTION HIOPERTIES I. ASTM W557, ASTM D698, AASHO T-180, AASHO-199 (4--inch diameter mold) 75.00 2. ASTM D155 7, A,STM D698, AASHC T-180, AASHO-1790 I � --inch diameter mold) 80.0''0 3. Cal-irnTcct (Colifornin Method 216) 70.00 4. Relwive Density (Vibratory Mefhod)(ASTM D2049) Ovoted 5. Cg P,, Cokealve Soil on 6. C3?, Cahcsionless Soil Request 7. Vc'ue, Unfreatec (ColifuTnio Method 30i-F) S31.00 cer T.E. .93.00 S. 'R" Value, Treated, Lime. or Cement (California 14jet'L.Od 301-F) :93.00 C. MECHANICAL PROPERTJ:S i. Direct Shecr, Undisturbed, Drained (+$10.00 for Saturation and Time Rating) 30.00 2. Direct Sheor, Remolded, Drained 510.00 for Saturation and Time Rating' � Time I 40.00 3. bricori;ined Compressive Strength (ASTM D2166) (unc!Ld-s content and dry density determination) (+ S10.00 for Stress-Stroin Plot) 15.00 4. Tr:oxial Compression: Ujic-_nsoliciate(i/Undrclii-.ed (includes water content and dry density Ciclerminchon) 10.11110 For two aciJil icncl phases) 40.00 5. Triaxial 'Compression: On con 5o i idn f e�/Und-ni ncHI/Sa tu rated Qucted 6. Triaxial Comprcsslcn: Cursolidzited"Oncl,ailied on 7. Triaxial Compress;on. S. Tricx;ul Compression: Ccnr.,,iiidnted,/DTained Request 9-. Swell, Sinale Point, Un6isturiied 40.00 :0. Swell, Single Point, Remcldeci 11. Volume Chonge: Field Moisture - Saturr--io� - Air Dry - Oven Dr,, 55.00 12. Consolidation (ASTM D;435) Including Time Comprassion & c Log P Curves 700.100 13. Perrrenbiiity Test, 1jr,dktL;,17,e-d Tube Somotp CJ.uof--.i 14. Pcrr-ecbility Test, Ur.dis�urccec-' Chunk 50.11pie on 15. Permeability Test, falbricjtcci 5rmole 16. Permeability - Density Relationship Request 'Multiphase tests can be performed D. FQI..IIPPOEP\!T RENTAL 1, Slone Indicntor lncl!"mArer with Opp.i---tor, 4 hauls !25.U0 B. hauls 225.00 4cSeismic. Timer 4 hours (NA;n.) 30.03 R8 Four, 50.00 APPENC. i >; G tr 3 of 3 • HOURLY RATE SCHEDULE Engineers Peter Kaldveer (Principal)--------50.00 Richard Short (Associate)---------34.00 Richard Rodgers (Sr. Eng,)---------29.00 Ronald Bajuniemi---------------28. 17 Alan Kropp -27.22 Technicians Patrick Stevens-----------------22.00 David Sanderfeld=-------------- 16.00 Office Sandra Burns------------------- 12.97 Cullen Schousten----------------9.60 Fetes Halridueur and 01mindulta-9 Geoiechnical Consultants PO i T OBELLO OFFICE CENTER ELEVEN EMBARCADERO WEST, OAKLAND, CALIFORNIA 94607, 415/839-1680 i i 1 AV ;A:.. In the Board of Supervisors of Contra Costa County, State of California April 15 , 19 75 In the Matter of Agreement with California Fish and Game , San Miguel Road, Concord Area, Work Order 6459. On motion of Supervisor E. A. Linscheid, seconded by Super- visor J. E. Moriarty, IT IS BY THE BOARD ORDERED that. Supervisor J. P. Kenny, Vice President, is AUTHORIZED to execute Agreement No . III-73-75 with the California Department of Fish and Game for slipout repair on San Miguel Road Adjacent to Pine Creek 0.75 miles north of Treat Boulevard, said agreement being required pursuant to sections 1601 -1602 of the California Fish and Game Code. The foregoing order was passed by the following vote : AYES : Supervisors A. M. Dias, J. E. Moriarty, E. A. Linscheid, J. P. Kenny. NOES: None . ABSENT: Supervisor W. N. Boggess . I hereby certify that the foregoing is a true and correct copy of an order entered on the minutes of said Board of Supervisors on the date aforesaid. cc : Public Works Director Witness my hand and the Seal of the Board of State of California Supervisors County Administrator affixed this 15th day,of April 19 75 //�� J. R. OLSSON, Clerk By C[�t- C ti Deputy Clerk H 24 12174 - 15-M Nancy S4 Ortega d90 AQ avno O9i'9 n-n 009.91901 • , ` , .�Y T •uot}aldwoo Tans o} loud sAup ang -saoau aq ,few ss pus uot}unuoxa 2uunp ;daaxa w2arw ;seal ;r sousiado jo uotpaldwoo jo a}up ay jo mut) s}t ao azlel aq} ut pa;raado aq }ou llugs ;uawdmbg -UI puu gs13 jo ;uatupuda(j aq} Ajt}ou llyA io4ujado aqL •IZ uopaldwoo •azlul ao zlaom uodn Alam pawwt panowaa aq llugs pue stuT.ta;uw wraa;s .Sur jo gzsw za}sm q2!q aq} 3o }ap3 OSI �i}IM alglpo.Tauou jo papm4suoo aq jlugs sjjg d.Tuaodwal 'II pa}tsodap aq llugs gsTggru ON •uaau J.zom 91[4woaj uot}oa.Hp wuaa}sdn uu ui wuaa}sumop woaj paaooad panowai aq Ijugs s►.zgap ao sluua}rw ssaoxa Cue `pa;ald Auu*uaou Ijugs Irnowaa aq} puu pa;aldwoa si IioM ay -moa aau suotpaado uagM •e}r}S ay jo saa}um `o}w uagM panowaa aq hugs luua}uw ani}aoddns ay puu jjouzu ao llujujua ,Sq pagsum aq ,Sum }i aaagm paould aansoloua aLLL •jetaa}ew ani}oa;oad 0011;o ao `deadu llooa ao o}ui aa;ua o; pamollr aq llugs ainpu 10na4egm 30 `2utlld }aags Aq pasoloua ;sag ssalun uoisoaa o} palgns .Ciro!;oe pa;rtoossu ao `uot;ona}suoo `2ut22o[ Niue woz}} saauu}sgns .Tag}o ao q}aua jo apuw aq }ou llugs s.zaruuq lutaa}uw uaq}ara so 0iuu2.10.1011}0 .zo s}anpoad waloa}0d ao s)luuq lauuugD •uaau �aom aq; woaj ao o}ut a2udaas .To Ito `joaaaq; s2utgsuM ao a}aaouoa ao }uawao `gsiq ;uanaad o} a}enbape aq hugs not}ona}suoo aatuuq ao -qna `;snpmus `gsuls `11.1uq `puns `}Its `Ilos 'sugap ON •03 lluuq lauuugD •pa}aldwoo si uotsaantp ay jo not}ana}s •maao smog Tons aaojaq zlauw as;um g2iq 3114 anoqu uoo uagm Cluo pa}lamp aq jjugs mog ag} pur `uot} seaae o}panowaa aq llugs smog leuosuas g2iq puu}sg}tm -oa.np wuaa}sdn uu ut anupuoa puu uaau wuaa}sumop o; patz2isap }ou sjeua}uw pa}utoossu pur sam}oru}S 6I aq} ut ut2aq Alluwaou hugs jauuego Mau ag} ao/pur aatueq aq} jo noponiisuoD •}uawanow qsg wean}s aauegan}stp o; -UA%Op pur wraa;sdn 2utpituaad jo algeduo lauuega aoud pa}sixa se 4uatpua2 amus aq} algtssod se Apuau su Mau a ao/pur `}aanlno dauaodwa} `.zatuuq e Aq uaau aq ljugs ui2auw ajul ao pagwuaa}s aTp jo 4uatpua2 aqL 31.10m aq} punoau pa}aanip aq llugs mogwuaa}s an}ua •walgoad uotso.la juu aan;nj u 2tn1uaao }noq;tm a}u}s aq} `algeptoneun st weaa}s 2utmog u ut laom uagM '0I Iran}ru s;i o} algtssod su Alaeau ss pauln}ai aq llugs •sa2uuga t aaa u ua sr uBauw a r u uaau a z aatn s Iauuugo ;u sjlg puu saauaucl ao s2utssoao }ana}suoa j. p �I �l g I 3I • 1q I o} ,Caussaaau a ,Sum su }daaxa sweaa}s ant 2utMo 0 ao Iauuuga aptM ;ug a ao `walgoad uotsoaa llurq am}nj q [ g j algtssod u 2ui;gaaa;nog}im a;u}s lran}eu s}i o;algtssod se slouuugo wean}s aq} ut pa}eaado aq jou llugs }uawdmbg g ,Clauau su pauan}aa aq llugs lauuuga mog Mol s}t `suop not}u}jts ou ao ap}tl asneo jliM gotgM -wado ay 2uianp pwa;lu uaaq ssq lauuuga wuaa;s u jj •gI lanua2 pagm" uealo su gans luua;uw woaj }ling aq Aluo •2wssoao llg-zlaoa zo `kTanlno jlugs pa}anapsuoo (uot}ona;sgo lelogt}ar Auu) wep Auy •g 192puq r llr}sui llugs iolmado aq} 's2uissoao pa}uadaa •a2essud qsg s}ana}sgo }ug} aataauq Auu o}ut ao,q •d}tptgan} wuaa}s 2utsuaaout Alluquu;sgns }notp!m pa}eaodaoaut aq }snw f}tltauj a2essud gsg a}rnbapu uV L pa}onpuoo aq llugs suoi;uaado gans `wraa}s 2utmog r ssoaou ;uawdinba jo 2uuow aalnbaa sunt}uaado jI 'LT wup aq} molaq aawi plgsg uTu}uluw o} wuaa}s -um•wuaa}s 011; woaj panowaa -gins ssud utopaauidsao .paum4uietus`p na;suoa aq Ijegs ;uaw.pas paddua; 0114 T}iM 2uoje lanra2 0114 gwaq st (uoT 4'sgo Irtagt}au Auu) wup Xuu uagm •g �i;tptgan; jo aualo si uaau aq} ut as;um 2ulmog Ilu aa}ju puu ;aa[oad 0114 jo uot;aldwoo uodn •ills ao pnw woaj •s.taaut2ua }uaw}audaQ Aq panoaddu aaaj st iloigm janra2 jo pa}ona;suoo aq Ijugs uisrq }uaw aq }snw suotpa2iw Tsg apadun ,Sllut;ua}od pinoo }ug} -go;ua sigL a;is 439f 0.1 011} molaq ila}ripawwt wraa}s saan;uaj aaq}o puu %Ills a4aaauoa jo u21sap ioj surd •S alp ssoaau pa}ons}shoo aq llugs utsuq }uawga;uo }Its V •9I •9pua2 lauuuga ureas}s molaq paoeld aq Ijugs s}aanjna •swuaa}s 2tnm01i ao allul }uauutuaad jo swo};og •apua2 lauuugo wsaa}s molaq u aa}ua o; pamollu aq }ou Ijugs suot}raado aaq;o ao 2ut so ;e paould aq llugs s}aanlno dtsao wa} jo swo}}og -gsum a4u2aa22e woaj}Its ao pnw 2utulu4uoa aapem qsu� SI sauna tiu ;u paanssu st qsg jo a2ussud wuaa}sumop ao wraa}s n puu pamudun jou si mog as}um ;uq} gans aq •uotsoaa jos;uoa llugs saw pmns aaq;o ao `s}aanlna `sa2puq jo uoi;ullu}suj •l; o} sltra; alaom aaq}o zo `szlora} }so `spuoa ;np uo paoeld aq hugs sllaago as;um ;uanbaa3 •jut}ua}od uotsoaa alpq •pogsilgs}saaa awooaq o} q;tm SLIM alqu}s o;ut pa}aantp aq Iltm seaejans algtpoaa pa}aadxa aq 6lgruosuaa;ouuuo n01.4u;a29n aaagM seaau ut `daa}s woaj $ouna ;uq} os apuuz aq llugs uot;uaudaad TT paarld aq llugs not}aa}oad uotsoaa aaq}o so `dwdu `flood •E •031ul ao wuaa}s aq; 2utgouaa •suaau pasodxa ao woaj as;um 2uuraq-41is 'paao100stp ;uanaad o} ajrl ao paddu;s jo uot}u}a2anaa aq} apnlouT llugs not}uao}sail •Z wraa;s ay woaj,fume pa}eool aq llugs suisuq 2tn1}}0s}IIS 'Cl algtssod •pa;aldwoa st 31aoM aq} uagm panowaa aq llugs sr nopipuoa leui2uo aTaq} auau su o; paso}saa aq jlugs lutaa;rw anpaoddns �uu puu aansoloua aU •pallu}stn aq a3lul so wuaa}s atp jo zlarw aa;-em g2iq a11} mgpm ut2 hugs uaau 2m laoM a}utpawwi ay puoAaq azlul ay jo -arm ajul so iauuega wuaa;s Auu jo suopaod pagan}sip uot;u}lis ;uanaad o} aansolaua uir}ana u alqupionrun st aqL •suot}raa o a;aldwoa o; ,STussaoau wnwtutw aq; a)lul aq; ut 31aom jl •sjlg so saauaug }ana}suoo o; Cars paaoxa }ou llrgs uot:;u;a2an jo Ienowaa ao aourganig(l •T SNIOIZvamaNiN 0333 0. V! RIJ T11 LE JIT OF 'ISH QUID Gf WAIVER OF TINE FOR PROPOSALS SECTIONS 1 01-1.502 PURSUANT to the provisions of Sections 1601-1602, California Fish and Game Code, the undersigned parties hereby mutually agree to extend the thirty day period within which the Department of Fish and Game is otherwise require to provide recommendations to-protect fish and wildlife resources. This waiver applies to the following numbered notification (s). The extension mutually agreed upon will be for a period of days from the date of this waiver. Operatoa V' e Chairman Department Aepresentative Title Board of Su ervis• Title Organization Contra Costa County Department of Fish and Game State of California Date April 15, 105 Date FORTJ JOHN B. C gj 1057 Microfilmed with board order By DePul In the Board of Supervisors of Contra Costa County, State of California April 8 , 19 7 In the Matter of a Agreement with the State of California, Department of Fish and Game, Countywide. On motion of Supervisor A. M . Dias, seconded by Super- visor J. P. Kenny, IT IS BY THE BOARD ORDERED that Supervisor W. N. Boggess, Chairman, is AUTHORIZED to execute a "Blanket Agreement among Contra Costa County, Contra Costa County Flood Control and Water Conservation District, and the State of California, Department of Fish and Game , said agreement permit- ting routine maintenance work which falls within the purview of Fish and Game Code Sections 1601 and 1602 to be done without the necessity of agreements for each individual maintenance job for the remainder of the 1975 calendar year, being renewable on an annual basis . The foregoing order was passed by the following vote : AYES : Supervisors J. P. Kenny, A. M. Dias, J. E. Moriarty, E. A . Linscheid, W. N. Boggess . NOES: None . ABSENT:•,�' None . I hereby certify that the foregoing is a true and correct copy of an order entered on the minutes of said Board of Supervisors on the date aforesaid. Witness my hand and the Seal of the Board of cc : Public Works Director Supervisors Flood Control affixed this 8th day of April 19 75 ,_State. of California J. R. OLSSON Clerk County Administrator �� � By l e4eL.1 Deputy Clerk H 24 12/74 - 15-M Nancy S. Ortega ��. Contra Costa Flood Control & Water Conservation District . BLANKET AGREEMENT I�cation No. AGREEMENT REGARDING PROPOSED STREAM OR LAKE ALTERATION THIS AGREEMENT, entered into between the State of California, Department_of Fish and Game, hereinafter called the Department, and Contra Costa Countyy,�&��Coinitra Co_s_ta County Flood Control and of Contra Costa, State of Calif �a onsePvahe einatfer called the operator, as follows: WHEREAS, pursuant to Section 1 6-]–1602— of CaliforniaFish and Game Code, the operator, on the--j8 day of March , 19 755 , notified the Department that lie intends to substantially divert or obstruct the natural flow of, or substantially change the bed, channel, or bank of, or use material from the streambed of, the following water: Contra Costa Flood Control District in the County.of - Contra Costa , State of California, S T —R . WHEREAS, the Department hereby certifies that an inspection of subject area was made on the 18 day of March 19 5, by the following Department personnel: Stanley G DeSilya and it was determined that an existing.fish or game resource may be substantially adversely affected by such operations. THEREFORE, the Department hereby proposes measures to protect fish and wildlife during the operator's work. The operator hereby agrees to accept the following recommendations as part of his work: Numbers 1 6 18 20 _ _ _ _ from the list of recommendations on the - back of this page and the following special'iecorimmendations: 1. All work in or near the stream or lake shall be confined to the period 975 2. Work will be confined to minor maintenance activities, which are limited- . o the following: a. Mowing or ,diar 'nn of woods and grass h. Removal nf vegetation in insure prnpunr flinrt-loning of! low measuring station,_ water control f cri 1iti os etc - c - Removal of wnnAy and hor_}1ac ous the l nwor nnrti nns of +ha_-r-hannel. d- Romnwal of trees, ( fal l on) hr�nr•h anr� aSS^ni at8d d9b '3:8-. o_ Removal of soil, Ao}Iri c rubbi oh and connroto lined cbanne:l s f- Regal nr placement of f1gshboards in a divers!an dam n Cleaning and cepa-i-�—n' p ma_tcTvi—other-Mater ee� V2 devi ---- - h Replacement of Aroded. bank nrOteG+i On at eri&1-67 If the operator's work changes from that stated in the notification specified above, this agreement is no longer valid and a new notification shall be submitted to the Department of Fish and Game. Failure to comply with the provisions of this agreement and with other pertinent Code Sections, including but not limited to Fish and Game Code Sections 5650, 5652 and 5948, may result in prosecution. Nothing in this agreement authorizes the operator to trespass on any land or property, nor does it relieve the operator of responsibili • for compliance with applicable federal, state, or local laws or ordinances. This agree entre es effective o March 1 8, 1975 ran D ce r 1 197 Operator s ze y eSilvaW, artme Representative TitleJGh irNMI:an,9coard o upervisors Title patrol Lieutenant Organization Contra Costa County Department of Fish and Game, State of California Date April 8, 1975 Date FORM APPROVED JOHN B. CLAUSEN, County Counsel Microfilmed with board order . FG 1060 112.791 RECOMMENDATIONS 1. Disturbance or removal of vegetation shall not exceed sary to construct barriers or fills. If work in the lake the minimum necessary to complete operations. The is unavoidable, a curtain enclosure to prevent siltation disturbed portions of.any stream channel or lake mar, of the lake beyond the immediate working area shall gin within the high water; mark of the stream or lake be installed.The enclosure and any supportive material shall be restored to as near their original condition as shall be removed when the work is completed. possible. 13. Silt settling basins shall be located away from the stream 2. Restoration shall include the revegetation of stripped or lake to prevent discolored, silt-bearing water from, or exposed areas. reaching the stream or lake. 3. Rock, riprap, or other erosion protection shall be placed 14. Preparation shall be made so that runoff from steep, in areas where vegetation cannot reasonably be expected erodible surfaces will be diverted into stable areas with to become reestablished. little erosion potential. Frequent water checks shall be 4. Installation of bridges, culverts, or other structures shall placed on dirt roads, cat tracks, or other work trails to g � control erosion. ,be such that water flow is not impaired and upstream or downstream passage of fish is assured at all times. 15. Wash water containing mud or silt from aggregate wash- Bottoms of temporary culverts shall be placed at or ing or other operations shall not be allowed to enter a below stream channel grade. Bottoms of permanent lake or flowing streams. culverts shall be placed below stream channel grade. 16. A silt catchment basin shall be constructed across the 5. Plans for design of concrete sills and other features stream immediately below the project site. This catch- that could potentially impede fish migrations must be ment basin shall be constructed of gravel which is free approved by Department engineers., > from mud or silt. Upon .completion of the project and 6. When an dam after all flowing water in the area is clear of turbidity, y (any artificial obstruction) is being the gravel along,with the trapped sediment shall be constructed, maintaihed,_or-placed in operation, suffi- ... -removed from the stream: cient water shall at all times be allowed to.pass down stream to maintain fishlife below the dam. 17. If operations require moving of equipment across a flowing stream,. such operations shall be conducted 7. An adequate fish passage.facility must be incorporated - - without substantially increasing stream turbidity. For into any barrier that°obstructs fish passage. repeated crossings, the operator shall install'a bridge, 8. Any dam (any artificial obstruction) constructed shall culvert, 'or rock-fill crossing. only be built from material such as clean washed gravel 18'. If a stream channel_ has been altered during the opera - which will cause little or no siltation. . tions, its low flow channel shall be returned as nearly 9. Equipment shall not-be operated in the stream channels as possible to its natural state.without creating a possible of flowing live streams except as may be necessary.to future.bank erosion problem, or a flat wide channel or construct crossings or barriers and fills at channel sluice-like area. If a lake margin has been altered, it changes. shall be returned as nearly as possible to its natural 10. When work in, a flowing stream is, unavoidable the state:without creating a future:bank.erosion problem. entire streamflow shall be diverted around the work The gradient of the streambed or lake margin shall be area by a barrier, temporary culvert, and/or a new as nearly as possible the.sanie_gradient as existed-'prior channel capable of permitting upstream and down- to disturbance. stream fish movement. Construction of the barrier 19. Structures and associated materials not designed to and/or the new channel shall normally begin in the withstand high seasonal flows shall be removed to areas downstream area and continue 'in an upstream direc- tion, and the flow shall be diverted only when con- above the high water mark before such flows occur. struction of the diversion is completed. Channel bank 20. No debris, soil, silt, sand, bark, slash, sawdust, rub- or barrier construction shall be adequate to prevent bish, cement or concrete or washings thereof, oil or seepage into or from the work area. Channel banks or from products or other organic or earthen material barriers shall not be made of earth or other substances from any logging, construction, or associated activity subject to erosion unless first enclosed by sheet piling, of whatever nature shall.'be allowed toenter into or rock riprap, or other protective material. The enclosure placed where it may be washed by rainfall-or runoff and the supportive material shall be removed when into, waters of the State. When operations are com- the work is completed and the removal shall normally pleted, any excess materials or debris shall be removed proceed from downstream in an upstream direction. .. from the work. area.; No rubbish shall be deposited 11. Temporary fills shall be constructed of nonerodible within 150 feet of the high water mark of any stream materials and shall be removed immediately upon work or lake. completion. 21. The operator will notify the Department of Fish and 12. Equipment shall not be operated in the lake or its Game of the date of completion of operations at least margin:except during excavation and as may be. neces- five days prior to such completion. 18616.600 11.73 6.260 ROAD(DT OSP