HomeMy WebLinkAboutMINUTES - 07231985 - X.2 THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA
Adopted this Order on July 23, 1985 by the following vote:
AYES: Supervisors °Powers , McPeak, Torlakson and Fanden
NOES: None
ABSENT: Supervisor Schroder
ABSTAIN: None
SUBJECT: Authorizing the Issuance of a Warrant to the Treasurer of the United
States for the local share of the Walnut Creek Project costs through September
30, 1985, Flood Control Zone 3B, Project No. 7520-6B8687•..
The Chief Engineer has recommended the payment of $139,000 as the local
share of costs due the Corps of Engineers for the design and construction of the
Walnut Creek project through September 30, 1985.
IT IS BY THE BOARD ORDERED, as the governing body of the Contra Costa
County Flood Control and Water Conservation District, that the recommended action
of the Chief Engineer is APPROVED and the County Auditor-Controller is AUTHORIZED _
to issue a warrant in the amount of $139,000 payable to the Treasurer of the United
States. The Auditor-Controller is DIRECTED to notify Roger Gilchrist of the
Public Works Department Accounting Division when said warrant is available for
transmittal to the Corps of Engineers, Sacramento District, 650 Capitol Mall ,
Sacramento, California 95814.
i Hereby certify tha'this Is a trod and corroct copy of
an action taken and entered on the minutes of the
Hoard of Supervisors on the date shown.
ATTESTED: JUL 2,3 1905
PHIL BATCHELOR, Clerk of the Board
of Supervisors and County/administrator
•� L12.2..� , Deputy
Orig. Dept. Public Works Department
Flood Control Planning
cc: County Administrator
County Auditor-Controller
Public Works Director
Flood Control Planning
Accounting
File: 40038-113-25
LIB:pg
bo:FCZ3b.t7