Loading...
HomeMy WebLinkAboutMINUTES - 07231985 - X.2 THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA Adopted this Order on July 23, 1985 by the following vote: AYES: Supervisors °Powers , McPeak, Torlakson and Fanden NOES: None ABSENT: Supervisor Schroder ABSTAIN: None SUBJECT: Authorizing the Issuance of a Warrant to the Treasurer of the United States for the local share of the Walnut Creek Project costs through September 30, 1985, Flood Control Zone 3B, Project No. 7520-6B8687•.. The Chief Engineer has recommended the payment of $139,000 as the local share of costs due the Corps of Engineers for the design and construction of the Walnut Creek project through September 30, 1985. IT IS BY THE BOARD ORDERED, as the governing body of the Contra Costa County Flood Control and Water Conservation District, that the recommended action of the Chief Engineer is APPROVED and the County Auditor-Controller is AUTHORIZED _ to issue a warrant in the amount of $139,000 payable to the Treasurer of the United States. The Auditor-Controller is DIRECTED to notify Roger Gilchrist of the Public Works Department Accounting Division when said warrant is available for transmittal to the Corps of Engineers, Sacramento District, 650 Capitol Mall , Sacramento, California 95814. i Hereby certify tha'this Is a trod and corroct copy of an action taken and entered on the minutes of the Hoard of Supervisors on the date shown. ATTESTED: JUL 2,3 1905 PHIL BATCHELOR, Clerk of the Board of Supervisors and County/administrator •� L12.2..� , Deputy Orig. Dept. Public Works Department Flood Control Planning cc: County Administrator County Auditor-Controller Public Works Director Flood Control Planning Accounting File: 40038-113-25 LIB:pg bo:FCZ3b.t7