Loading...
HomeMy WebLinkAboutMINUTES - 09181984 - X.4 2.1/ ME BOARD OF SEMERVMM S CF OOD M OOSM COMA'f, CATMCl1NIA Adopted this Order cn September 18, 1984 by the following vote: Ate: Supervisors Powers , Fanden, McPeak $ Torlakson NOES: None ABS : Supervisor Schroder ABSTAIN: None SUBJECT: In the Matter of Award of Contract for the Paving and Related Work of Buchanan Field Airport Improvements Project No. AIP 3-06-0050-02. Bidder Total Amount Bond Amounts 0. C. Jones and Sons $667,231.50 Payment $667,231.50 1520 Fourth Street Faith. Perf. $667,231.50 Berkeley, CA 94710 McGuire and Hester Bay Cities Paving and Grading, Inc. Grade-Way Construction Eugene G. Alves Construction Co., Inc. The above-captioned project and the specifications therefor being approved, bids being duly invited and received by the Public Works Director; and The Public Works Director recommending that the bid listed first above is the lowest responsible bid and this Board concurring and so finding; IT IS BY THE BOARD ORDERED, that the contract for the furnishing of labor and materials for said work is awarded to said first listed bidder at the listed amount and at the unit prices submitted in said bid pending further approval by the Federal Aviation Administration; and that said contractor shall present two good and sufficient surety bonds as indicated above; and that the Public Works Department shall prepare the contract therefor. IT IS FURTHER ORDERED that, after the contractor has signed the contract and returned it together with bonds as noted above and any required certificates of insurance or other required documents, and the Public Works Director has reviewed and found them to be sufficient, the Public Works Director is authorized to sign the contract for this Board. IT IS FURTHER ORDERED that, in accordance with the project specificaticns and/or upon signature of the contract by the Public Works Director, any bid bonds posted by the bidders are to be exonerated and any checks or cash submitted for bid security shall be returned. 1 hereby certify that this is a true and correct copy e1 an action taken and entered on the minutes o:the pt�: Public Works Department Crrig.De Board of Supervisor Pon tho dato shown Buchanan Field Airport ATTESTED: PHIL BATCHELOR, Clerk of the Coord cc: County Administrator of Supervisors and County Ar�m!nistrator County Auditor-Controller Public Works Director By I�F , Deputy Accounting Division Contractor PavAward02.18.t9 06263 2- 11 THE BMW CPS[ msoRS ag amm Dom aO wff, Cm.IImwm Adopted this Order on September 18, 1984 by the following vote: AYES: Supervisors Powers , Fanden, McPeak & Torlakson NOES: None ABSENT: Supervisor Schroder ABSTAIN: None SUB=: In the Matter of Award of Contract for the Slurry Seal of Buchanan Field Airport Improvements Project No. AIP 3-06-0050-02. Bidder Total Amount - Bond Amounts Valley Slurry Seal Co., Inc. $276,264 Payment $276,264 P.O. Box 26132 Faith. Perf. $276,264 Sacramento, CA 95826 No additional bids recieved. The above-captioned project and the specifications therefor being approved, bids being duly invited and received by the Public Works Director; and The Public Works Director recommending that the bid listed first above is the lowest responsible bid and this Board concurring and so finding; IT IS BY THE BOARD ORDERED, that the contract for the furnishing of labor and materials for said work is awarded to said first listed bidder at the listed amount and at the unit prices submitted in said bid pending further approval by the Federal Aviation Administration; and that said contractor shall present two good and sufficient surety bonds as indicated above; and that the Public Works Department shall prepare the contract therefor. IT IS FURTHER ORDERED that, after the contractor has signed the contract and returned it together with bonds as noted above and any required certificates of insurance or other required documents, and the Public Works Director has reviewed and found them to be sufficient, the Public Works Director is authorized to sign the contract for this Board. IT IS FURTHER ORDERED that, in aeoordance with the project specifications and/or upon signature of the contract by the Public Works Director, any bid bonds posted by the bidders are to be exonerated and any checks or cash submitted for bid security shall be returned. I hereby certify that this is a true and correct copy of an action taken and entered on the minutes o'• the Board of Supervisors on the date shown. Orig.Dept.: Public Works Department ATTESTED: 'Z�Ie' I Pf ll Buchanan Field Airport PHIL DAT HC LC.R. alert; of the Doard of Supervisors and County Adrnin!st:stcr cc: County Administrator County Auditor-Controller By � . Deputy Public Works Director Accounting Division Contractor S1urAward02.18.t9 00264