HomeMy WebLinkAboutMINUTES - 09181984 - X.4 2.1/
ME BOARD OF SEMERVMM S CF OOD M OOSM COMA'f, CATMCl1NIA
Adopted this Order cn September 18, 1984 by the following vote:
Ate: Supervisors Powers , Fanden, McPeak $ Torlakson
NOES: None
ABS : Supervisor Schroder
ABSTAIN: None
SUBJECT: In the Matter of Award of Contract for the Paving and Related
Work of Buchanan Field Airport Improvements Project No. AIP 3-06-0050-02.
Bidder Total Amount Bond Amounts
0. C. Jones and Sons $667,231.50 Payment $667,231.50
1520 Fourth Street Faith. Perf. $667,231.50
Berkeley, CA 94710
McGuire and Hester
Bay Cities Paving and Grading, Inc.
Grade-Way Construction
Eugene G. Alves Construction Co., Inc.
The above-captioned project and the specifications therefor being
approved, bids being duly invited and received by the Public Works Director;
and
The Public Works Director recommending that the bid listed first
above is the lowest responsible bid and this Board concurring and so
finding;
IT IS BY THE BOARD ORDERED, that the contract for the furnishing
of labor and materials for said work is awarded to said first listed
bidder at the listed amount and at the unit prices submitted in said
bid pending further approval by the Federal Aviation Administration;
and that said contractor shall present two good and sufficient surety
bonds as indicated above; and that the Public Works Department shall
prepare the contract therefor.
IT IS FURTHER ORDERED that, after the contractor has signed the
contract and returned it together with bonds as noted above and any required
certificates of insurance or other required documents, and the Public
Works Director has reviewed and found them to be sufficient, the Public
Works Director is authorized to sign the contract for this Board.
IT IS FURTHER ORDERED that, in accordance with the project specificaticns
and/or upon signature of the contract by the Public Works Director, any
bid bonds posted by the bidders are to be exonerated and any checks or
cash submitted for bid security shall be returned.
1 hereby certify that this is a true and correct copy e1
an action taken and entered on the minutes o:the
pt�: Public Works Department
Crrig.De Board of Supervisor Pon tho dato shown
Buchanan Field Airport ATTESTED:
PHIL BATCHELOR, Clerk of the Coord
cc: County Administrator of Supervisors and County Ar�m!nistrator
County Auditor-Controller
Public Works Director By I�F , Deputy
Accounting Division
Contractor
PavAward02.18.t9
06263
2- 11
THE BMW CPS[ msoRS ag amm Dom aO wff, Cm.IImwm
Adopted this Order on September 18, 1984 by the following vote:
AYES: Supervisors Powers , Fanden, McPeak & Torlakson
NOES: None
ABSENT: Supervisor Schroder
ABSTAIN: None
SUB=: In the Matter of Award of Contract for the Slurry Seal of
Buchanan Field Airport Improvements Project No. AIP 3-06-0050-02.
Bidder Total Amount - Bond Amounts
Valley Slurry Seal Co., Inc. $276,264 Payment $276,264
P.O. Box 26132 Faith. Perf. $276,264
Sacramento, CA 95826
No additional bids recieved.
The above-captioned project and the specifications therefor being
approved, bids being duly invited and received by the Public Works Director;
and
The Public Works Director recommending that the bid listed first
above is the lowest responsible bid and this Board concurring and so
finding;
IT IS BY THE BOARD ORDERED, that the contract for the furnishing
of labor and materials for said work is awarded to said first listed
bidder at the listed amount and at the unit prices submitted in said
bid pending further approval by the Federal Aviation Administration;
and that said contractor shall present two good and sufficient surety
bonds as indicated above; and that the Public Works Department shall
prepare the contract therefor.
IT IS FURTHER ORDERED that, after the contractor has signed the
contract and returned it together with bonds as noted above and any required
certificates of insurance or other required documents, and the Public
Works Director has reviewed and found them to be sufficient, the Public
Works Director is authorized to sign the contract for this Board.
IT IS FURTHER ORDERED that, in aeoordance with the project specifications
and/or upon signature of the contract by the Public Works Director, any
bid bonds posted by the bidders are to be exonerated and any checks or
cash submitted for bid security shall be returned.
I hereby certify that this is a true and correct copy of
an action taken and entered on the minutes o'• the
Board of Supervisors on the date shown.
Orig.Dept.: Public Works Department ATTESTED: 'Z�Ie' I Pf ll
Buchanan Field Airport PHIL DAT HC LC.R. alert; of the Doard
of Supervisors and County Adrnin!st:stcr
cc: County Administrator
County Auditor-Controller By � . Deputy
Public Works Director
Accounting Division
Contractor
S1urAward02.18.t9
00264