SUBJECT: In the Matter of Award of Contract for E1 Toyonal Slide Repair,
Project No. 067.2-6U6318-82, Orinda Area.
Bidder Total Amount Bond Amounts
William P. Young, Inc. $52,465.00 Payment $26,233.00
570 Price Avenue Faith. Perf. $52,465.00
Redwood City, CA 94063
P & F Construction, Inc.
Pfister Excavating
Brudigam Development, Inc.
W & W Construction
The above-captioned project and the specifications therefor being
approved, bids being duly invited and received by the Public Works Director;
and
The Public Works Director recommending that the bid listed first
above is the lowest responsible bid and this Board concurring and so
finding;
IT IS BY THE BOARD ORDERED, that the contract for the furnishing
of labor and materials for said work is awarded to said first listed
bidder at the listed amount and at the unit prices submitted in said
bid; and that said contractor shall present two good and sufficient surety
bonds as indicated above; and that the Public Works Department shall
prepare the contract therefor.
IT IS FURTHER ORDERED that, after the contractor has signed the
conCract and returned it together with bonds as noted above and any required
certificates of insurance or other required documents, and the Public
Works Director has reviewed and found -them to be sufficient, the Public
Works Director is authorized to sign the contract for this Board.
IT IS FURTHER ORDERED that, in accordance with the project specifications
and/or upon signature of the contract by the Public Works Director, any
bid bonds posted by the bidders are to be exonerated and any checks or
cash submitted for bid security shall be returned.
1 hereby cattily it,of this isa tru^and c-2rreet copy of
an action tal-mr,and cater:. ��. ry.?. ?e of the
Board of Scspenri' a on it-v.' :ie si*v..:�.
ATTESTED: 5/
AT4;Dr^
PHIL_ rLe.C.'ri, Clry;': of Vie Board
Design and Construction Division •
Urig.Uept.: Nub I is Works Department of SuiATQ r Ord t;c�rly .
cc: County Administrator By Deputy
County Auditor-Controller
Public Works Director
Design and Construction Division
Accounting Division
Contractor
DC:ELTOYONALBO.T9