Loading...
HomeMy WebLinkAboutMINUTES - 09181984 - X.3 -c . 3 THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA Adopted this Order on September 18, 1984 by the following vote: AYES: Supervisors Powers , Fanden, McPeak and Torlakson NOES: None ABSENT: Supervisor Schroder ABSTAIN: None SUBJECT: In the Matter of Award of Contract for E1 Toyonal Slide Repair, Project No. 067.2-6U6318-82, Orinda Area. Bidder Total Amount Bond Amounts William P. Young, Inc. $52,465.00 Payment $26,233.00 570 Price Avenue Faith. Perf. $52,465.00 Redwood City, CA 94063 P & F Construction, Inc. Pfister Excavating Brudigam Development, Inc. W & W Construction The above-captioned project and the specifications therefor being approved, bids being duly invited and received by the Public Works Director; and The Public Works Director recommending that the bid listed first above is the lowest responsible bid and this Board concurring and so finding; IT IS BY THE BOARD ORDERED, that the contract for the furnishing of labor and materials for said work is awarded to said first listed bidder at the listed amount and at the unit prices submitted in said bid; and that said contractor shall present two good and sufficient surety bonds as indicated above; and that the Public Works Department shall prepare the contract therefor. IT IS FURTHER ORDERED that, after the contractor has signed the conCract and returned it together with bonds as noted above and any required certificates of insurance or other required documents, and the Public Works Director has reviewed and found -them to be sufficient, the Public Works Director is authorized to sign the contract for this Board. IT IS FURTHER ORDERED that, in accordance with the project specifications and/or upon signature of the contract by the Public Works Director, any bid bonds posted by the bidders are to be exonerated and any checks or cash submitted for bid security shall be returned. 1 hereby cattily it,of this isa tru^and c-2rreet copy of an action tal-mr,and cater:. ��. ry.?. ?e of the Board of Scspenri' a on it-v.' :ie si*v..:�. ATTESTED: 5/ AT4;Dr^ PHIL_ rLe.C.'ri, Clry;': of Vie Board Design and Construction Division • Urig.Uept.: Nub I is Works Department of SuiATQ r Ord t;c�rly . cc: County Administrator By Deputy County Auditor-Controller Public Works Director Design and Construction Division Accounting Division Contractor DC:ELTOYONALBO.T9 002Ct2