HomeMy WebLinkAboutMINUTES - 09111984 - X.4 THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA
Adopted this Order on September 11, 1984 by the following vote:
AYES: Supervisors Powers , McPeak and . Torlakson
NOES: None
ABSENT: Supervisors Fanden $ Schroder
ABSTAIN: None
SUBJECT: In the Matter of Award of Contract for Drainage Area 13, Line A,
Project No. 7552-6D8422-84, Alamo Area.
Bidder Total Amount Bond Amounts
Pfister Excavating $119,110.00 Payment $59,555.00
P. 0. Box 1883 Faith. Perf. $119,110.00
Vacaville, California 95696
KIP, Inc.
Dalzell Corporation
Peter Cole Jensen, Inc.
The above-captioned project and the specifications therefor being
approved, bids being duly invited and received by the Chief Engineer;
and
The Chief Engineer recommending that the bid listed first above
is the lowest responsible bid and this Board concurring and so finding;
IT IS BY THE BOARD ORDERED, sitting in its capacity as the governing
body of the Contra Costa County Flood Control and Water Conservation
District, that the contract for the furnishing of labor and materials
for said work is awarded to said first listed bidder at the listed amount
and at the unit prices submitted in said bid; and that said contractor
shall present two good and sufficient surety bonds as indicated above;
and that the Flood Control District shall prepare the contract therefor.
IT IS FURTHER ORDERED that, after the contractor has signed the
contract and returned it together with bonds as noted above and any required
certificates of insurance or other required documents, and the Chief
Engineer has reviewed and found them to be sufficient,. the Chief Engineer
is authorized to sign the contract for this Board.
IT IS FURTHER ORDERED that, in accordance with the project specifications
and/or upon signature of the contract by the Chief Engineer , any bid
bonds posted by the bidders are to be exonerated and any checks or cash
submitted for bid security shall be returned.
1 hereby certify that th;�.�s 1 true tinct 40rrect cG^;,of
on oction fatten end var t?rNc! oil Vlo min::!ss o" the
Board o7 Super;,E3o os C10 dato Shawn.
ATTEST'F.D: //
PEi1L GA7'irt �:.CR9 Clert: of tyo Board
Orig.Dept.: Public Works Department of Superrtaasc � :d Cour y Admi:77;:tr8tor
Design and Construct;on Division
cc: County Administrator 9y , Deputy
County Auditor-Controller
Public Works Director/Chief Engineer
Design and Construction Division
Accounting Division
Flood Control Planning
Contractor
DC:DAI3LINEABO.T9
00094