Loading...
HomeMy WebLinkAboutMINUTES - 09111984 - X.3 X_3 THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA Adopted this Order on September 11, 1984 by the following vote: AYES: Supervisors Powers , McPeak and Torlakson NOES: None ABSENT: Supervisors Fanden Schroder ABSTAIN: None SUBJECT: In the Matter of Award of Contract for Drainage Area 13, Lines C and C-4, Project No. 7552-6D8445-84, Alamo Area. Bidder Total Amount Bond Amounts Pfister Excavating $77,589.00 Payment $38,795.00 P. 0. Box 1883 Faith. Perf. $77,589.00 Vacaville, California 95696 Dalzell Corporation Richard Sawdon General Engineering, Inc. The above-captioned project and the specifications therefor being approved, bids being duly invited and received by the Chief Engineer; and The Chief Engineer recommending that the b-id listed first above is the lowest responsible bid and this Board concurring and so finding; IT IS BY THE BOARD ORDERED, sitting in its capacity as the governing body of the Contra Costa County Flood Control and Water Conservation District, that the contract for the furnishing of labor and materials for said work is awarded to said first listed bidder at the listed amount and at the unit prices submitted in said bid; and that said contractor shall present two good and sufficient surety bonds as indicated above; and that the Flood Control District shall prepare the contract therefor. IT IS FURTHER ORDERED that, after the contractor has signed the contract and returned it together with bonds as noted above and any required certificates of insurance or other required documents, and the Chief Engineer has reviewed and found them to be sufficient, the Chief Engineer is authorized to sign the contract for this Board. IT IS FURTHER ORDERED that, in accordance with the project specifications and/or upon signature of the contract by the Chief Engineer, any bid bonds posted by the bidders are to be exonerated and any checks or cash submitted for bid security shall be returned. Orig.Dept.: Public Works Department Design and Construction Division I hereby certify that this is a true and correct copy of cc: County Administrator an action taken and entared on thG m"notes of the County Auditor-Controller Board of Supervisorg on the date shown. Public Works Director/Chief Engineer ATTESTED: 4 Iii Design and Construction Division PML BATCHEL0.11, Clea: of the Board Accounting Division of Sup".Isors and Corur;ty:aCnikaa:rator Flood Control Planning Contractor By ✓ Deputy DC:DAI3LINECBO.T9 00093