HomeMy WebLinkAboutMINUTES - 07241984 - X.2 x �
THE BOARD OF SUPERVISORS OF CONTRA COSTA-COUNTY, CALIFORNIA
Adopted this Order on July 24, 1984 , by the following vote:
AYES: Supervisors Powers , Fanden, Schroder, McPeak, Torlakson
NOES: None
ABSENT: None
ABSTAIN: None
SUBJECT: In the Matter of Award of Contract for Traffic Signal , Parker Avenue
and Second Street, Rodeo Area, Project No. 0662-6U4232-82.
Bidder Total Amount Bond Amounts
Rosendin Electric, Inc. $67,350.00 Payment $33,675.00
880 Mabury Faith. Perf. $67,350.00
P. 0. Box 5061
San Jose, California 95150
Continental Electric, Inc.
Richard A. Heaps Electrical Contractor
Steiny and Company, Inc.
The above-captioned project and the specifications therefor being approved,
bids being duly invited and received by the Public Works Director; and
The Public Works Director recommending that the bid listed first above is
the lowest responsible bid and this Board concurring and so finding;
IT IS BY THE BOARD ORDERED, that the contract for the furnishing of labor
and materials for said work is awarded to said first listed bidder at the listed
amount and at the unit prices submitted in said bid; and that said contractor shall
present two good and sufficient surety bonds as indicated above; and that the Public
Works Department shall prepare the contract therefor.
IT IS FURTHER ORDERED that, after the contractor has signed the contract
and returned it together with bonds as noted above and any required certificates of
insurance or other required documents, and the Public Works Director has reviewed and
found them to be sufficient, the Public Works Director is authorized to sign the
contract for this Board.
IT IS FURTHER ORDERED that, in accordance with the project specifications
and/or upon signature of the contract by the Public Works Director, any bid bonds
posted by the bidders are to be exonerated and any checks or cash submitted for bid
security shall be returned.
Orig. Dept. : Public Works Department
Design and Construction Division ihereby certify that this isatrue and correct copy of
cc• County Administrator an action taken and entered on the minutes of the
County Audi tor-Cbntrol l er Board of Supervisors on the date shown.
Public Works Director ATTESTED: a 4
Design and Construction Division COUNTY CLERK
Accounting Division J.19. OL SON,
Contractor (via Pivv) and ex officio Clerk of the Board
gy , Deputy
0002. . 3