HomeMy WebLinkAboutRESOLUTIONS - 10172007 - RES-284 IN THE BOARD OF SUPERVISORS
OF
CONTRA COSTA COUNTY, STATE OF CALIFORNIA
In the Matter of Amending
the Agreement between the
County of Contra Costa and RESOLUTION NO.
East Bay Municipal Utility
District dated May 8, 1959•
The Board of Supervisors of the County of Contra
Costa approves the attached Amendment to the above Agreement
and authorizes its chairman to execute same.
PASSED AND ADOPTED this 5th day of September ,
1961, by the following Grote of theWAR
AYES: Supervisors James P. Kenny, Adel F.
Nielsen, Thomas John Coll, Edmund A.
Li.nschei_d, Joseph S. Silva .
NOES; Supervisors - None .
ABSENT: Supervisors - None .
RESOLUTION N(2
STAT 'five- agreoment the Coixnvy �.f Contra costa
aynBay Municlpal DtIlItY DI' tttri c 3 datVd sM Y 8 1959,, be
amended d `a accordance °vdth the follou k ,
. Route B-1 Is approvedby both, parties and Cowity
will Immediately order p'reparation of precise plans for oo s ruo—
tion. As anon as PIWO are propared, Cow ty will go to id.$
award o or aa� and eonstruat B-1 route. EPv.UD will advanee
fum-da for pent in aecordance with above arena .
tRB-MUD
", county will order pr _ e �� ri and. preps -
estimate for construetion of B-H route.
e
pay the cost preeime engineerizig and estimating for he B-Ti
route. 'UponoompIttion of angineering., the estimate of the cast
of eonstr ting B-11 route will be dotermined. If County then
termines to build 3-41 route., the total Odst of design andoxo-
;z-leu tior, will be paid- -by EMU, the same as for route -1. I
the event the County determines t 'build route Os the District
will contrilbute to the County the sa-1 . estimated cost of con-
strt,tation of route B-H as d temined by Who engineering coat
estlrAtea above mentioned. 71te amount so paid or con rIbute
shall be used by the only for construttlon of route 3-H
or routeor soma reasons:h4le deviation.deviation.9 from such routes,, as
presently delineated,, as are required by problems of terrain or
other engineering and cost considerations.
If ELAMUD is required to pay owner of Cutter property
severanced s attributable solely to the County d temi in n
to build a route otber than B-H or failljig to detemine to build
any 'llolqt, then in that emit,, such severance damages reTilred
to be paid shall be deduw-twd from the cost, "SMD would otherili
284
be obligated to pay, la the event the Cutter property in ao-
,gg1rw y negotiated sa tlame t the County shall have the rigtit
to first approve any S included In the nattlemant aa z e .,ran
i
damages attributable sUnly to the County etsvmKirig to bulld
route other than B-H or fai >Z to datermine t it an rout .*
IN WITNESS WHOOP, the partl,-,a herz�ato 1-wve, ', "fit•
this reement the 5th day of, September
EAS`.' BAY MU. P`. L VOLI I DISTRICT
e-fi
4 441BY
.. .
air n,7 Board of Supervisors
JW
-2-