Loading...
HomeMy WebLinkAboutRESOLUTIONS - 01011961 - RES-033 IN THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, STATE OF CALIFORNIA In the Matter of Amending the Agreement between the County of Contra Costa and East Bay Municipal Utility F ig SOLUTION NO. District dated May 8, 1959. 3 The Board of Supervisors of the County of Contra Costa does resolve as follows.- THAT ollows:THAT the agreement between the County of Contra Costa and East Bay Municipal Utility District, dated May 8, 1959, be amended in accordance with the following: 1. Route B-1 is approved by both parties and County will immediately order preparation of precise plans for con- struction. As soon as plans are prepared, County will go to bid award contract and construct B-1 route. EBMUD will advance funds for payment in accordance with above agreement. 2. County will order precise engineering and prepara- tion of cost estimate for construction of B-H route. EBRUD will pap the cost of precise engineering and estimating for the B-H route. Upon, completion of engineering, the estimate of the cost of constructing B-H route will be determined. If County then determines to build B-H route the total east of design and con- struction will be paid by EBI&I the same as for route B-1. In the event the County determines to build route C, the District will contribute to the County the said estimated cost of con- struction of route B-H as determined by the engineering cost estimates above mentioned. The amount so paid or contributed shall be used by the County only for construction of route B-H or route C, or such reasonable deviations from such routes as presently delineated as are required by problems of terrain or other engineering and cost considerations. If EBMUD is required to pay owner of Cutter property severance damages attributable solely to the County determining to build a route other than B-H, then in that event, such severance damages required to be paid shall be deducted from the cost EEMUD would otherwise be obligated to pay. In the event the Cutter property is acquired by negotiated:_ settlement the County shall have the right to first approve any sum included in the settlement as severance damages attributable solely to the County determining to build a route other than B--H. 3. In addition to other costs, EBMUD agrees to pay County for lees of use of its present interest in the existing roads which are closed by construction. This loss of use will be computed by multiplying the present value of the roads by interest at the rate of T6 per annum, prorated from date of closure to date replacement read is open for use. . PASSED AND ADOPTED this 18th day of ,April, 1961, by the following vote of the Board: AYES: Supervisors James P. Kenny Thomas John Doll, Edmund A. Linscheid, JosepA S. Silva. NOES: None. ABSENT: Supervisor Niel F. Nielsen. T 033