HomeMy WebLinkAboutRESOLUTIONS - 10162007 - 2007/576 `� �' IIII III III I III II III III II II IIII II III I IIII I III III II
CONTRA COSTA Co Recorder Office
Recording Requested By: STEPHEN L, WEIR4Clerk-Recorder
Contra Costa County Public Works Dept. DOC— 200 r—0289145-00
Construction Division Wednesday, OCT 17, 2007 11:58:20
255 Glacier Drive FRE $0.00
Martinez, CA 94553 Tt 1 Pd $0.00 Nbr-0003885454
ENG/R9/1-2
Return to:
PUBLIC WORKS DEPARTMENT _
CONSTRUCTION DIVISIOANRTT
255 GI6E0i TSUPEOISORS OF CONTRA COSTA COUNTY, CALIFORNIA
AS THE GOVERNING BOARD OF THE
FLOOD CONTROL &WATER CONSERVATION DISTRICT
Adopted this Resolution on October 16, 2007 by the following vote:
AYES: SUPERVISORS GIOIA,
UILKEMA, BONILLA,AND PIEPHO
NOES: NONE
ABSENT; SUPERVISOR GLOVER
ABSTAIN: NONE
F _
RESOLUTION NO. 2007/,57-(,p
SUBJECT: In the Matter of Accepting and Giving Notice of Completion of Contract for the Las
Trampas Creek Bank Restoration at Glenside Drive Project. Lafayette area. (District
III) Project No. 7520-6B9M12-07
The Board of Supervisors of Contra Costa County RESOLVES that:
The County of Contra Costa on June 26, 2007, contracted with Jim Freethy Excavating, Inc. for
excavating the embankment to a slope of 1.5 horizontal to 1.0 vertical, placing rock slope protection
at the toe of the bank, reconstructing a portion of the asphalt concrete parking lot, reconstructing
the concrete driveway entrance, installation of fencing and other such items and details not
mentioned above with Financial Pacific Insurance Company as surety, for work to be performed on
the grounds of the County; and
The Chief Engineer.reports that said work has been inspected and complies with the approved
plans, special provisions and standard specifications and recommends it acceptance as complete as
of September 28, 2007.
Therefore, said work is ACCEPTED as complete on said date, and the Clerk shall file with the
County Recorder a copy of this Resolution and Notice as a Notice of Completion for said contract.
I hereby certify that this is a true and correct copy of
an action taken and entered on the minutes of the
MC:jd:kg Board of Supervisors on the date shown.
G:\Const\130\2006\11-14-06 San Ramon Creek Completion.doc
Orig. Dept.: Public Works(Construction Division) �?
RECORDING TO BE COMPLETED BY COB ATTESTED: ( 2y �Pr; oZ�o 7-Z
cc: Auditor JOHN CULLEN, Clerk of the Board of Supervisors and
J. Dowling,Construciton
S. Kowalewski,Traffic County Administrator
Jim Freethy Excavating,Inc.