HomeMy WebLinkAboutRESOLUTIONS - 01272003 - 99-333 File: 300-9901/B.4.1
THE BOARD OF SUPERVISORS
CONTRA COSTA COUNTY, CALIFORNIA
Adopted this Order of June 22, 1999,by the following vote:
AYES: SUPERVISORS GIOIA,UILMMA,GERBER,DESAULNIER and CANCIAMILLA
NOES: NONE
ABSENT: NONE
ABSTAIN: NONE RESOLUTION NO. 99/333
SUBJECT: Approving Plans and Specifications for
Play Structures at Los Nogales Head Start Center,
Brentwood and Los Arboles Head Start Center,
Oakley for Community Services Department
(CP#98-17 and CP#98-19)
Authorization No. WPA335
WHEREAS plans and specifications for Play Structures at Los Nogales Head Start Center,
Brentwood and Los Arboles Head Start Center, Oakley for Community Services Department,
have been filed with the Board this day by the Director of General Services;and
WHEREAS plans and specifications were prepared by Amphion; and
WHEREAS the cost estimate for the initial construction contract is $80,900.00; and
WHEREAS the Board has obtained the general prevailing rates of wages, which shall be
the minimum rates paid on this project; and
WHEREAS the Board has previously reviewed and considered the Negative Declaration of
Environmental Significance, and found on May 5, 1998 that the project will not have a
significant effect on the environment and that an Environmental Impact Report is not required
and a Notice of Determination was filed with the County Clerk on May 11, 1998;
IT IS BY THE BOARD RESOLVED that said plans and specifications are hereby
APPROVED. Bids for this work will be received on July 22, 1999 at 2:00 p.m., and the Clerk
of this Board is directed to publish a Notice to Contractors in accordance with Section 220.37 of
the Public Contract Code, inviting bids for said work, said Notice to be published in
CONTRA COSTA TIMES . The Director of General Services is
directed to mail notices to the construction trade ,journals specified in Section 22036 of the
Public Contract Code at least 30 days before the date of opening the bids.
IT IS FURTHER RESOLVED that the Director of General Services, or his designee, is
AUTHORIZED to issue bid Addenda, as needed, for clarification of the contract bid
documents, provided the involved changes do not significantly increase the cost estimate for the
initial construction contract.
I hemby ca"Ify that this is a tree and Comet COPY Of
an action taken and entered on the min5w of the
Board of 5tvv ims an ow date atw m.
A BA �fttt Cfert atM Td
By
Orig. Dept.: General Services Dept. -Architectural Divisio
cc: General Services Department
Architectural Division
G.S.Accounting
File: 300-9901/A.5
Auditor-Controller
Community Development
D. Foley
Community Services Department(Via AD)
Consultant
Is
HA1999130099t WAUt41ti8b.doc wised 6/15/99)
RESOLUTION 99/333