HomeMy WebLinkAboutRESOLUTIONS - 10281997 - 97-573 THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA
Adopted this Resolution on October 28, 1997, by the following voter
AYES: Supervisors Rogers, Uilkema, Gerber, Canciamilla, DeSaulnier
NOES: None
ABSENT: None
ABSTAIN: None
RESOLUTION NO. 97/573
SUBJECT: Tabulation of Mail-In Ballots, Confirmation of Diagram and Assessment and Levy
of Street Light Charges for Minor Subdivision 3-96, County Service Area L-100,
EI Sobrante area.
The Board of Supervisors of Contra Costa County RESOLVES:
1. On September 9, 1997, the Board of Supervisors adopted Resolution No. 97/481 directing
the filing of the engineer's report for street light charges for County Service Area L-100.
As directed by the Board, the Engineer of Work has filed the engineer's report.
2. On September 9, 1997, the Board adopted Resolution No. 97/481 declaring the Board's
intention to levy and collect street light charges to operate and maintain facilities and
services within CSA L-100 for fiscal year 1997-98 and setting a public hearing for October
28, 1997. Notice of the hearing was given in the time and manner required by law.
3. Resolution No. 97/481 directed the Engineer of work (Public Works Director) to cause to
be mailed to property owners within CSA L-100 the notices and ballots required by Section
4 of Article XIII D of the California Constitution (Proposition 218).
4. The notices and ballots have been mailed to property owners and the returned ballots are
ready to be tabulated.
NOW, THEREFORE, the Board FINDS, DETERMINES and ORDERS that:
1. A public hearing was held before this Board on October 28, 1997 at 11:00 a.m. At the
hearing, the Engineer of Work presented to the Board all ballots received from property
owners within Minor Subdivision 3-96 a proposed tabulation of those ballots. The.Board
heard and considered all protests against the proposed assessments and tabulated the
returned ballots according to the proportional financial obligation of the affected properties.
The Board also afforded to every interested person an opportunity to make a protest to the
engineer's report, either in writing or orally, and the Board.considered each protest.
2. A majority protest, as defined in section 4(e) of Article XIII D, does not exist.
3. The Board hereby confirms the diagram and assessment as set forth in the report of the
Engineer of Work and hereby levies the street light charges set forth therein in Minor
Subdivision 3-96 for fiscal year 1997-98.
SE:csItereby:aeitll "that this to a true and correct Dopy Of
g:\EngSvc\SpDist\801August\MS3-96.Res I, BCtlon taken and entered on the Minutes the
tlosrd Supe
CnDepof 1111 on te dais shown.
Dep.: Public Works Department(Special Districts) /(+�(j.�
Contact: -Skip Eppedy,313-2253 if
7 77
cc: Assessor PHIL BATCHELOR.Clerk of tho board
Auditor-Controller of Supervisors County Administrator pe Sorg and County AdralnlaltratOf
County Counsel
Accounting .may
;S
RESOLUTION NO. 97/573